Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0185 # 06 Y:2004 | 06 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,297 | $4,020 | Not Implemented |
LE0185 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $915 | $100 | Implemented |
LE0185 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $411 | $1,125 | Not Implemented |
LE0185 # 09 Y:2004 | 09 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $132 | $300 | Not Implemented |
LE0185 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,631 | $76,467 | Implemented |
LE0184 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $35,446 | $0 | Not Implemented |
LE0184 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $34,434 | $10,000 | Implemented |
LE0184 # 03 Y:2004 | 03 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $15,203 | $2,000 | Not Implemented |
LE0184 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,237 | $0 | Implemented |
LE0184 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,137 | $200 | Implemented |
LE0184 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,355 | $1,500 | Implemented |
LE0184 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,017 | $30,709 | Implemented |
SU0182 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26,427 | $0 | Not Implemented |
SU0182 # 02 Y:2004 | 02 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $174 | $0 | Implemented |
SU0182 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,773 | $381 | Implemented |
SU0182 # 04 Y:2004 | 04 | 2004 | USE SYNTHETIC LUBRICANT | $3,517 | $1,200 | Implemented |
SU0182 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $2,158 | $1,678 | Not Implemented |
LE0183 # 01 Y:2004 | 01 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $54,350 | $390,000 | n/a |
LE0183 # 02 Y:2004 | 02 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $49,237 | $10,000 | Implemented |
LE0183 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $12,090 | $7,000 | Not Implemented |
LE0183 # 04 Y:2004 | 04 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,113 | $2,497 | Not Implemented |
LE0183 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,591 | $750 | Not Implemented |
LE0183 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,467 | $500 | Not Implemented |
LE0183 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,086 | $21,041 | Not Implemented |
WV0284 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,486 | $300 | Implemented |