IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0163 # 04 Y:2000 04 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,481 $5,600 Not Implemented
DS0163 # 05 Y:2000 05 2000 SELL OIL TO RECYCLER $412 $320 Not Implemented
DS0163 # 06 Y:2000 06 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $1,033 $4,000 Not Implemented
DS0163 # 07 Y:2000 07 2000 PAY BILLS ON TIME TO AVOID LATE FEES $640 $-1,560 Implemented
IA0242 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,701 $169 Not Implemented
IA0242 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $833 $1,167 Not Implemented
IA0242 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $604 $2,000 Not Implemented
IA0242 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $276 $45 Not Implemented
IA0242 # 05 Y:2000 05 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $79 $25 Not Implemented
IA0242 # 06 Y:2000 06 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,636 $675 Not Implemented
IA0242 # 07 Y:2000 07 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $448 $890 Not Implemented
IA0242 # 08 Y:2000 08 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $4,883 $123 Not Implemented
IA0242 # 09 Y:2000 09 2000 APPLY FOR INVESTMENT INCENTIVES $3,531 $250 Not Implemented
KU0537 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $970 $1,480 Not Implemented
KU0537 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $580 $0 Not Implemented
KU0537 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $200 Not Implemented
KU0537 # 04 Y:2000 04 2000 METER WASTE WATER $2,980 $1,910 Not Implemented
KU0537 # 05 Y:2000 05 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,180 $1,740 Not Implemented
CO0463 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,240 $26,000 Implemented
CO0463 # 02 Y:2000 02 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,710 $7,500 Implemented
CO0463 # 03 Y:2000 03 2000 REDUCE VENTILATION AIR $1,500 $1,900 Not Implemented
CO0463 # 04 Y:2000 04 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,260 $1,260 Implemented
CO0463 # 05 Y:2000 05 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $700 $1,870 Implemented
CO0463 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $310 $900 Implemented
CO0463 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $200 $410 Implemented