IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0617 # 01 Y:2001 01 2001 $90,000 $111,000 Implemented
UD0617 # 02 Y:2001 02 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $98,016 $60,000 Implemented
UD0617 # 03 Y:2001 03 2001 REPROCESS SPENT OILS ON SITE FOR RE-USE $20,174 $3,131 Not Implemented
UD0617 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,875 $0 Not Implemented
UD0617 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,578 $695 Implemented
UD0617 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,273 $260 Not Implemented
UD0617 # 07 Y:2001 07 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,073 $0 Not Implemented
TA0004 # 01 Y:2001 01 2001 $91,307 $1,161 Implemented
TA0004 # 02 Y:2001 02 2001 RECOVER AND REUSE WASTE MATERIAL $27,800 $35 Implemented
TA0004 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,501 $919 Implemented
TA0004 # 04 Y:2001 04 2001 $3,432 $5,220 n/a
TA0004 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,267 $1,357 Implemented
TA0004 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $513 $284 Not Implemented
TA0004 # 07 Y:2001 07 2001 $424 $0 Implemented
AM0397 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $67,500 $1,500 Not Implemented
AM0397 # 02 Y:2001 02 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $24,500 $0 Implemented
AM0397 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $20,000 $60,000 Implemented
AM0397 # 04 Y:2001 04 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $18,400 $0 Implemented
AM0397 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $13,950 $0 Not Implemented
AM0397 # 06 Y:2001 06 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $11,700 $1,400 Not Implemented
AM0397 # 07 Y:2001 07 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,700 $0 Implemented
AM0397 # 08 Y:2001 08 2001 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $600 $0 Not Implemented
WI0393 # 01 Y:2001 01 2001 DISTILL CONTAMINATED SOLVENTS FOR REUSE $19,159 $14,000 n/a
WI0393 # 02 Y:2001 02 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $10,173 $19,500 n/a
WI0393 # 03 Y:2001 03 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $9,162 $11,500 n/a