IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94,135

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0480 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,175 $3,200 Implemented
OR0480 # 03 Y:2005 03 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $493 $0 Implemented
OR0480 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $1,910 $2,000 Not Implemented
AS0397 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,864 $15,000 Not Implemented
AS0397 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,302 $1,000 Not Implemented
AS0397 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,147 $6,757 Not Implemented
AS0397 # 04 Y:2005 04 2005 REDUCE SCRAP PRODUCTION $474 $150 Not Implemented
AS0397 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $520 $250 Not Implemented
SD0358 # 01 Y:2005 01 2005 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $10,212 $3,850 Not Implemented
SD0358 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,194 $360 Implemented
SD0358 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $980 $76 Not Implemented
SD0358 # 04 Y:2005 04 2005 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $593 $0 Not Implemented
SD0358 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $550 $1,050 Implemented
SD0358 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,023 $37,287 Implemented
SD0358 # 07 Y:2005 07 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $13,768 $18,500 Not Implemented
SD0358 # 08 Y:2005 08 2005 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $37,125 $52,500 Implemented
LM0094 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $500 Implemented
LM0094 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,502 $983 Implemented
LM0094 # 03 Y:2005 03 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $57,780 $50,000 Implemented
LM0094 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,187 $34,080 Not Implemented
LM0094 # 05 Y:2005 05 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,628 $0 Not Implemented
CO0559 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,070 $440 Implemented
CO0559 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $355 $416 Implemented
CO0559 # 03 Y:2004 03 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,190 $740 Implemented
CO0559 # 04 Y:2004 04 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,180 $810 Implemented