IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0062 # 11 Y:1996 11 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,789 $0 Implemented
GT0587 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,034 $0 Implemented
GT0587 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,400 $14,090 Implemented
GT0587 # 03 Y:1996 03 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $480 $0 Not Implemented
GT0587 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $23,230 $31,000 Not Implemented
GT0587 # 05 Y:1996 05 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,340 $7,000 Not Implemented
GT0587 # 06 Y:1996 06 1996 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $7,300 $503 Implemented
OR0266 # 01 Y:1996 01 1996 EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING $5,657 $2,800 Implemented
OR0266 # 02 Y:1996 02 1996 UPGRADE CONTROLS ON COMPRESSORS $16,123 $7,260 Implemented
OR0266 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,329 $5,300 Not Implemented
OR0266 # 04 Y:1996 04 1996 OPTIMIZE PLANT POWER FACTOR $3,043 $10,600 Not Implemented
OR0266 # 05 Y:1996 05 1996 ADJUST BURNERS FOR EFFICIENT OPERATION $70,500 $45,000 Not Implemented
OR0266 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,400 $179,000 Not Implemented
WV0094 # 01 Y:1996 01 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $450 $640 Implemented
WV0094 # 02 Y:1996 02 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,654 $42 Implemented
WV0094 # 03 Y:1996 03 1996 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $14,094 $8,910 Not Implemented
WV0094 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,561 $968 Not Implemented
WV0094 # 05 Y:1996 05 1996 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,367 $4,500 Not Implemented
WV0094 # 06 Y:1996 06 1996 USE PLASTIC PALLETS INSTEAD OF WOOD $11,520 $5,784 Not Implemented
WV0094 # 07 Y:1996 07 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,272 $7,000 Implemented
DS0054 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,316 $11,936 Implemented
DS0054 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $949 $2,852 Implemented
DS0054 # 03 Y:1996 03 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,415 $3,500 Not Implemented
DS0054 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,866 $240 Implemented
DS0054 # 05 Y:1996 05 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,755 $4,750 Not Implemented