Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0397 # 04 Y:2001 | 04 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $18,400 | $0 | Implemented |
AM0397 # 05 Y:2001 | 05 | 2001 | USE SYNTHETIC LUBRICANT | $13,950 | $0 | Not Implemented |
AM0397 # 06 Y:2001 | 06 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $11,700 | $1,400 | Not Implemented |
AM0397 # 07 Y:2001 | 07 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,700 | $0 | Implemented |
AM0397 # 08 Y:2001 | 08 | 2001 | SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM | $600 | $0 | Not Implemented |
IC0004 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,919 | $1,100 | Implemented |
IC0004 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $730 | $3,200 | Not Implemented |
IC0004 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,217 | $65,216 | Implemented |
IC0004 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $826 | $2,328 | Implemented |
IC0004 # 05 Y:2001 | 05 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $224,000 | $9,200 | Not Implemented |
IC0004 # 06 Y:2001 | 06 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $702,000 | $8,500 | Not Implemented |
UM0183 # 01 Y:2001 | 01 | 2001 | USE CORRECT SIZE STEAM TRAPS | $2,880 | $2,500 | n/a |
UM0183 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $1,400 | $1,200 | n/a |
UM0183 # 03 Y:2001 | 03 | 2001 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $700 | $3,000 | n/a |
UM0183 # 04 Y:2001 | 04 | 2001 | TREAT AND REUSE RINSE WATERS | $780 | $1,000 | n/a |
UM0183 # 05 Y:2001 | 05 | 2001 | MINIMIZE WATER USAGE | $2,400 | $5,000 | n/a |
UM0183 # 06 Y:2001 | 06 | 2001 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $4,900 | $7,400 | n/a |
UM0183 # 07 Y:2001 | 07 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,500 | $1,000 | n/a |
UM0183 # 08 Y:2001 | 08 | 2001 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $10,800 | $14,400 | n/a |
LM0003 # 01 Y:2001 | 01 | 2001 | INSTALL SKYLIGHTS | $1,651 | $4,100 | Not Implemented |
LM0003 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,862 | $0 | Implemented |
LM0003 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,731 | $460 | Implemented |
LM0003 # 04 Y:2001 | 04 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,824 | $0 | Implemented |
LM0003 # 05 Y:2001 | 05 | 2001 | MAINTAIN MACHINES TO REDUCE LEAKS | $750 | $350 | Implemented |
LM0003 # 06 Y:2001 | 06 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $7,268 | $1,500 | Not Implemented |