Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0464 # 09 Y:2013 | 09 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $935 | $3,500 | Not Implemented |
WV0464 # 10 Y:2013 | 10 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $791 | $1,320 | Not Implemented |
WV0464 # 11 Y:2013 | 11 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $323 | $500 | Implemented |
WV0463 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,159 | $16,082 | Implemented |
WV0463 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,997 | $14,290 | Implemented |
WV0463 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,058 | $2,164 | Not Implemented |
WV0463 # 04 Y:2013 | 04 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,352 | $1,000 | Not Implemented |
WV0463 # 05 Y:2013 | 05 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,730 | $818 | Not Implemented |
WV0463 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,349 | $2,378 | Implemented |
WV0463 # 07 Y:2013 | 07 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,250 | $0 | Not Implemented |
WV0463 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,099 | $5,677 | Implemented |
WV0463 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $933 | $214 | Implemented |
WV0463 # 10 Y:2013 | 10 | 2013 | IMPROVE LUBRICATION PRACTICES | $560 | $500 | Implemented |
WV0463 # 11 Y:2013 | 11 | 2013 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $534 | $61 | Not Implemented |
WV0463 # 12 Y:2013 | 12 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $116 | $164 | Not Implemented |
WV0463 # 13 Y:2013 | 13 | 2013 | DISCONNECT BALLASTS | $59 | $77 | Implemented |
BS0013 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,038 | $5,639 | Implemented |
BS0013 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,210 | $20 | Implemented |
BS0013 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $199 | $250 | Not Implemented |
BS0013 # 04 Y:2013 | 04 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,825 | $22,200 | Not Implemented |
BS0013 # 05 Y:2013 | 05 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $312 | $77 | Implemented |
BS0013 # 06 Y:2013 | 06 | 2013 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,270 | $360 | Not Implemented |
SU0333 # 01 Y:2013 | 01 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,521 | $0 | Not Implemented |
SU0333 # 02 Y:2013 | 02 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $248,290 | $56,904 | Not Implemented |
SU0333 # 03 Y:2013 | 03 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $2,654 | $9,540 | Not Implemented |