Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0179 # 10 Y:2004 | 10 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $215 | $0 | Implemented |
SU0176 # 01 Y:2004 | 01 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $50 | $0 | Not Implemented |
SU0176 # 02 Y:2004 | 02 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $19,192 | $4,348 | Implemented |
SU0176 # 03 Y:2004 | 03 | 2004 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $2,160 | $939 | Implemented |
SU0176 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $934 | $434 | Implemented |
SU0176 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,095 | $13,007 | Not Implemented |
LE0180 # 01 Y:2004 | 01 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $46,917 | $0 | Implemented |
LE0180 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,802 | $17,364 | Not Implemented |
LE0180 # 03 Y:2004 | 03 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,024 | $2,200 | Implemented |
LE0180 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,020 | $300 | Implemented |
LE0180 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,067 | $1,200 | Implemented |
LE0180 # 06 Y:2004 | 06 | 2004 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $942 | $550 | Implemented |
LE0180 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $903 | $1,350 | Not Implemented |
SU0174 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,108 | $0 | Implemented |
SU0174 # 02 Y:2004 | 02 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $58,500 | $16,260 | Implemented |
SU0174 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $85 | $45 | Implemented |
SU0174 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,102 | $13,384 | Implemented |
SU0174 # 05 Y:2004 | 05 | 2004 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $13,639 | $14,240 | Implemented |
SU0174 # 06 Y:2004 | 06 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,489 | $10,360 | Implemented |
LE0177 # 01 Y:2004 | 01 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,980 | $1,700 | Not Implemented |
LE0177 # 02 Y:2004 | 02 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,947 | $5,000 | Not Implemented |
LE0177 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,194 | $0 | Implemented |
LE0177 # 04 Y:2004 | 04 | 2004 | USE OPTIMUM THICKNESS INSULATION | $516 | $585 | Implemented |
LE0175 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,828 | $400 | Implemented |
LE0175 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $642 | $0 | Not Implemented |