Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,403
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DS0054 # 06 Y:1996 | 06 | 1996 | CONVERT TO ELECTROSTATIC POWDER COATING | $39,602 | $6,000 | Not Implemented |
DS0054 # 07 Y:1996 | 07 | 1996 | REDUCE SCRAP PRODUCTION | $27,000 | $15,600 | Implemented |
OR0265 # 01 Y:1996 | 01 | 1996 | KEEP EQUIPMENT CLEAN | $2,162 | $0 | Implemented |
OR0265 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,493 | $1,000 | Implemented |
OR0265 # 03 Y:1996 | 03 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,288 | $2,371 | Implemented |
OR0265 # 04 Y:1996 | 04 | 1996 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $20,901 | $62,500 | Not Implemented |
MA0367 # 01 Y:1996 | 01 | 1996 | INSTALL SET-BACK TIMERS | $1,053 | $0 | Not Implemented |
MA0367 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,828 | $11,453 | Not Implemented |
MA0367 # 03 Y:1996 | 03 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,825 | $0 | Implemented |
MA0367 # 04 Y:1996 | 04 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,880 | $600 | Implemented |
MA0370 # 01 Y:1996 | 01 | 1996 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $321,166 | $27,000 | Not Implemented |
MA0370 # 02 Y:1996 | 02 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,771 | $146,000 | Not Implemented |
MA0370 # 03 Y:1996 | 03 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,513 | $32,940 | Not Implemented |
MA0370 # 04 Y:1996 | 04 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,249 | $90,000 | Not Implemented |
MA0370 # 05 Y:1996 | 05 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,599 | $18,000 | Not Implemented |
ND0243 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,365 | $556 | Implemented |
ND0243 # 04 Y:1996 | 04 | 1996 | TURN OFF EQUIPMENT WHEN NOT IN USE | $564 | $100 | Implemented |
ND0243 # 05 Y:1996 | 05 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $169 | $400 | Not Implemented |
ND0243 # 06 Y:1996 | 06 | 1996 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $41 | $0 | Implemented |
ND0243 # 07 Y:1996 | 07 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,889 | $10,440 | Implemented |
ND0243 # 08 Y:1996 | 08 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $855 | $1,120 | Not Implemented |
ND0243 # 09 Y:1996 | 09 | 1996 | OPTIMIZE PLANT POWER FACTOR | $265 | $192 | Implemented |
ND0243 # 10 Y:1996 | 10 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $518 | $250 | Not Implemented |
ND0243 # 11 Y:1996 | 11 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,180 | $800 | Implemented |
ND0243 # 12 Y:1996 | 12 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $496 | $700 | Not Implemented |