Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0185 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $5,163 | $1,069 | Not Implemented |
SU0185 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $9,676 | $30,734 | Implemented |
OR0455 # 01 Y:2004 | 01 | 2004 | RECOVER AND REUSE WASTE MATERIAL | $45,100 | $16,200 | Implemented |
OR0455 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,570 | $0 | Implemented |
OR0455 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,670 | $6,670 | Not Implemented |
OR0455 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $2,140 | $1,750 | Implemented |
OR0455 # 05 Y:2004 | 05 | 2004 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $1,420 | $150 | Implemented |
OR0455 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,510 | $790 | Not Implemented |
UM0253 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,527 | $19,692 | Implemented |
UM0253 # 02 Y:2004 | 02 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,810 | $3,150 | Implemented |
UM0253 # 03 Y:2004 | 03 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,558 | $750 | Implemented |
UM0253 # 04 Y:2004 | 04 | 2004 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,806 | $9,583 | Implemented |
UM0253 # 05 Y:2004 | 05 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,055 | $1,229 | Not Implemented |
UM0253 # 06 Y:2004 | 06 | 2004 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,580 | $810 | Implemented |
UM0253 # 07 Y:2004 | 07 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $122 | $5 | Implemented |
WI0468 # 01 Y:2004 | 01 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $124,013 | $650,000 | Not Implemented |
WI0468 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,024 | $103,390 | Implemented |
WI0468 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $673 | $150 | Implemented |
WI0468 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,655 | $13,500 | Not Implemented |
WI0468 # 05 Y:2004 | 05 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,209 | $16,500 | Implemented |
WI0468 # 06 Y:2004 | 06 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $14,113 | $10,500 | Not Implemented |
WI0468 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,043 | $1,280 | Implemented |
WI0468 # 08 Y:2004 | 08 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,932 | $360 | Not Implemented |
WI0468 # 09 Y:2004 | 09 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $824 | $1,600 | Not Implemented |
UD0694 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $318,395 | $324,700 | Not Implemented |