IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0615 # 05 Y:1997 05 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $70,347 $112,950 Implemented
GT0615 # 06 Y:1997 06 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $5,355 $4,400 Not Implemented
GT0615 # 07 Y:1997 07 1997 METER WASTE WATER $890 $1,800 Not Implemented
GT0615 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,705 $3,890 Not Implemented
CO0387 # 01 Y:1997 01 1997 RECOVER WASTE HEAT FROM EQUIPMENT $6,360 $8,400 Implemented
CO0387 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,130 $1,500 Implemented
CO0387 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $289 $288 Implemented
CO0387 # 04 Y:1997 04 1997 REPAIR AND ELIMINATE STEAM LEAKS $670 $140 Implemented
CO0387 # 05 Y:1997 05 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $380 $430 Implemented
CO0387 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $220 $290 Implemented
CO0387 # 07 Y:1997 07 1997 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $18,030 $4,000 Implemented
CO0387 # 08 Y:1997 08 1997 INSTALL BACK-UP EQUIPMENT $33,500 $90,000 Implemented
CO0387 # 09 Y:1997 09 1997 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $15,600 $21,000 Implemented
UD0518 # 01 Y:1997 01 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,625 $250 n/a
UD0518 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,672 $6,965 n/a
UD0518 # 03 Y:1997 03 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,121 $1,020 n/a
UD0518 # 04 Y:1997 04 1997 REUSE SCRAP GLASS AS FEED STOCK $4,800 $0 n/a
UD0518 # 05 Y:1997 05 1997 MINIMIZE WATER USAGE $15,010 $5,000 n/a
UF0177 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,139 $2,865 Not Implemented
UF0177 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82 $82 Implemented
UF0177 # 03 Y:1997 03 1997 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $152 $680 Not Implemented
UF0177 # 04 Y:1997 04 1997 INSTALL TIMERS AND/OR THERMOSTATS $221 $200 Implemented
UF0177 # 05 Y:1997 05 1997 RECOVER WASTE HEAT FROM EQUIPMENT $2,415 $4,600 Not Implemented
UF0177 # 06 Y:1997 06 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,392 $1,300 Implemented
UF0177 # 07 Y:1997 07 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,238 $0 Not Implemented