IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0416 # 08 Y:2002 08 2002 REPLACE CLOTH RAGS WITH PAPER TOWELS $690 $0 Not Implemented
WI0416 # 09 Y:2002 09 2002 RECOVER WASTE HEAT FROM EQUIPMENT $477 $0 Implemented
WV0236 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,180 $4,900 Implemented
WV0236 # 02 Y:2002 02 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $826 $585 Implemented
WV0236 # 03 Y:2002 03 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $29,035 $44,954 Not Implemented
WV0236 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,403 $124 Not Implemented
WV0236 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $37,820 $422 Implemented
WV0236 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,340 $84 Implemented
WV0236 # 07 Y:2002 07 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $1,206 $3,600 Implemented
WV0236 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $1,272 $750 Implemented
WV0236 # 09 Y:2002 09 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,994 $560 Implemented
WV0236 # 10 Y:2002 10 2002 RECOVER WASTE HEAT FROM EQUIPMENT $8,237 $2,163 Not Implemented
WV0236 # 11 Y:2002 11 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,850 $1,537 Not Implemented
WV0236 # 12 Y:2002 12 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $21,840 $13,000 Not Implemented
WV0236 # 13 Y:2002 13 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $14,000 $6,000 Not Implemented
MS0205 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,065 $8,070 Implemented
MS0205 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $5,039 $7,409 Not Implemented
MS0205 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $2,794 $4,590 Implemented
MS0205 # 04 Y:2002 04 2002 USE SYNTHETIC LUBRICANT $1,401 $396 Implemented
MS0205 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $463 $136 Implemented
MS0205 # 06 Y:2002 06 2002 DISCONNECT BALLASTS $438 $600 Implemented
MS0205 # 07 Y:2002 07 2002 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $459 $216 Not Implemented
MS0205 # 08 Y:2002 08 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $123 $240 Not Implemented
IC0031 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,703 $10,800 Implemented
IC0031 # 02 Y:2002 02 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,312 $3,338 Implemented