IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0158 # 08 Y:2016 08 2016 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $20,534 $96,100 Implemented
SD0521 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,923 $80,120 Not Implemented
SD0521 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,324 $35,903 Not Implemented
SD0521 # 03 Y:2016 03 2016 RECOVER AND REUSE WASTE MATERIAL $11,486 $5,500 Not Implemented
SD0521 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $8,590 $4,950 Not Implemented
SD0521 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,749 $1,000 Not Implemented
SD0521 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,938 $800 Not Implemented
SD0521 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,421 $3,450 Not Implemented
SD0521 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,279 $1,300 Not Implemented
SD0521 # 09 Y:2016 09 2016 INSTALL SKYLIGHTS $1,418 $3,648 Not Implemented
SD0521 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $566 $203 Not Implemented
SU0403 # 01 Y:2016 01 2016 INSTALL SPECTRAL REFLECTORS / DELAMP $282 $0 Not Implemented
SU0403 # 02 Y:2016 02 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,987 $0 Not Implemented
SU0403 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $887 $822 Implemented
SU0403 # 04 Y:2016 04 2016 ELIMINATE/REDUCE AN OPERATION $1,628 $5,950 Not Implemented
AM0697 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $52,850 $5,000 Implemented
AM0697 # 02 Y:2016 02 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,955 $2,000 Implemented
AM0697 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $11,450 $14,260 Not Implemented
AM0697 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,735 $72,050 Implemented
AM0697 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,830 $1,400 Implemented
AM0697 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,200 $405 Implemented
AM0697 # 07 Y:2016 07 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $370 $440 Implemented
AM0697 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $505 $10 Implemented
AM0697 # 09 Y:2016 09 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $320 $0 Implemented
BD0472 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,021 $12,366 Implemented