IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0162 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,597 $4,620 Implemented
LL0162 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,299 $855 Not Implemented
LL0162 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,812 $683 Not Implemented
LL0162 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,770 $0 Implemented
LL0162 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $2,099 $2,310 Not Implemented
LL0162 # 06 Y:2003 06 2003 USE PHOTOCELL CONTROLS $938 $82 Not Implemented
LL0162 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $229 $205 Not Implemented
LL0162 # 08 Y:2003 08 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $14,078 $3,120 Implemented
LM0057 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $543 $1,430 Implemented
LM0057 # 02 Y:2003 02 2003 ADD AREA LIGHTING SWITCHES $2,375 $3,580 Implemented
LM0057 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $140 Implemented
LM0057 # 04 Y:2003 04 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $140,025 $42,126 Implemented
LM0057 # 05 Y:2003 05 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $47,858 $12,520 Implemented
NC0255 # 01 Y:2003 01 2003 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $300,000 $150,000 Not Implemented
NC0255 # 02 Y:2003 02 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,060 $7,000 Not Implemented
NC0255 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,159 $5,600 Not Implemented
NC0255 # 04 Y:2003 04 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,602 $500 Not Implemented
NC0255 # 05 Y:2003 05 2003 REPAIR AND ELIMINATE STEAM LEAKS $2,425 $350 Implemented
NC0255 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $213 $240 Implemented
NC0255 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $668 $120 Not Implemented
UU0043 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $3,833 $5,820 Not Implemented
UU0043 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,032 $0 Not Implemented
UU0043 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,718 $32,302 Implemented
UU0043 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,467 $1,500 Not Implemented
UU0043 # 05 Y:2003 05 2003 USE SYNTHETIC LUBRICANT $4,235 $400 Not Implemented