IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0350 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,040 $250 Implemented
AM0350 # 08 Y:1999 08 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $19 Not Implemented
AM0350 # 09 Y:1999 09 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $900 $0 Implemented
AM0350 # 10 Y:1999 10 1999 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $149 $150 Not Implemented
AR0161 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,867 $161 Not Implemented
AR0161 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $271 $220 Implemented
AR0161 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,348 $130 Implemented
AR0161 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $149 $377 Implemented
AR0161 # 05 Y:1999 05 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,553 $8,938 Not Implemented
AR0161 # 06 Y:1999 06 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,472 $0 Implemented
AR0161 # 07 Y:1999 07 1999 RECOVER AND REUSE WASTE MATERIAL $2,864 $6,495 Not Implemented
AR0161 # 08 Y:1999 08 1999 DEVELOP STANDARD OPERATING PROCEDURES $4,840 $800 Implemented
UL0219 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $563 $20 Implemented
UL0219 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $8,356 $24,627 Implemented
UL0219 # 03 Y:1999 03 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $191 $0 Implemented
UL0219 # 04 Y:1999 04 1999 METER WASTE WATER $4,053 $0 Implemented
UL0219 # 05 Y:1999 05 1999 CLEAR AND RENT EXISTING SPACE $2,520 $300 Implemented
UL0219 # 06 Y:1999 06 1999 MODIFY CURRENT INCENTIVE PROGRAM $4,514 $60 Implemented
WI0346 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $128,017 $420,000 Not Implemented
WI0346 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,551 $500 Implemented
WI0346 # 03 Y:1999 03 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $129,034 $30,000 Not Implemented
WI0346 # 04 Y:1999 04 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $65,000 $140,000 Not Implemented
WI0346 # 05 Y:1999 05 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,102 $6,600 Not Implemented
WI0346 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,189 $1,480 Implemented
WI0346 # 07 Y:1999 07 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,593 $508 Implemented