IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0092 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,281 $170 Implemented
LM0092 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $211 $246 Not Implemented
LM0092 # 05 Y:2005 05 2005 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $62,655 $140,000 Implemented
LM0092 # 06 Y:2005 06 2005 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $12,597 $5,000 Implemented
LM0092 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,657 $5,000 Implemented
LM0092 # 08 Y:2005 08 2005 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $36,180 $5,000 Implemented
LM0092 # 09 Y:2005 09 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $98,438 $100,000 Implemented
LM0092 # 10 Y:2005 10 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $14,473 $100 Implemented
LM0092 # 11 Y:2005 11 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1,200 $100 Implemented
AS0395 # 01 Y:2005 01 2005 UPGRADE CONTROLS ON COMPRESSORS $5,134 $10,000 Implemented
AS0395 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,439 $1,000 Implemented
AS0395 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $429 $1,950 Implemented
AS0395 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $872 $800 Implemented
AS0395 # 05 Y:2005 05 2005 USE SOLAR HEAT TO HEAT WATER $1,228 $1,100 Not Implemented
AS0395 # 06 Y:2005 06 2005 USE A DIFFERENT OR RECYCLED RAW MATERIAL $7,600 $380 Not Implemented
MS0270 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $207,595 $1,008,706 Implemented
MS0270 # 02 Y:2005 02 2005 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $62,790 $34,773 Not Implemented
MS0270 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,478 $89,204 Implemented
MS0270 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,299 $0 Implemented
MS0270 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,451 $228 Implemented
MS0270 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,035 $0 Not Implemented
MS0270 # 07 Y:2005 07 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $877 $0 Implemented
MS0270 # 08 Y:2005 08 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $635 $1,300 Not Implemented
SF0302 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $0 Implemented
SF0302 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,557 $11,268 Not Implemented