IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0186 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,104 $2,080 Implemented
LL0186 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,748 $4,250 Implemented
LL0186 # 07 Y:2004 07 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,313 $96 Not Implemented
LL0186 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $694 $90 Not Implemented
LL0186 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $452 $315 Implemented
LL0186 # 10 Y:2004 10 2004 COMBINE UTILITY METERS $2,613 $720 Implemented
LL0186 # 11 Y:2004 11 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,500 $60 Implemented
UM0252 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $47,515 $40,000 Implemented
UM0252 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $25,105 $17,104 n/a
UM0252 # 03 Y:2004 03 2004 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $9,272 $16,000 Implemented
UM0252 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,381 $400 Implemented
UM0252 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,568 $3,999 Implemented
WI0467 # 01 Y:2004 01 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $15,905 $15,000 Implemented
WI0467 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,050 $12,800 Not Implemented
WI0467 # 03 Y:2004 03 2004 INSTALL TIMERS AND/OR THERMOSTATS $2,729 $400 Implemented
WI0467 # 04 Y:2004 04 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,231 $300 Implemented
WI0467 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $601 $0 Not Implemented
WI0467 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $345 $640 Implemented
SD0339 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,112 $320 Implemented
SD0339 # 02 Y:2004 02 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,250 $2,570 Not Implemented
SD0339 # 03 Y:2004 03 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,831 $0 Implemented
SD0339 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $477 $1,700 Not Implemented
SD0339 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,362 $10,000 n/a
MS0248 # 01 Y:2004 01 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,530 $120 n/a
MS0248 # 02 Y:2004 02 2004 AIR CONDITION ONLY SPACE NECESSARY $4,615 $2,282 n/a