IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0107 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,021 $32,160 Not Implemented
OR0693 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,809 $500 Not Implemented
OR0693 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $5,614 $2,800 Not Implemented
OR0693 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,216 $28,216 Not Implemented
OR0693 # 04 Y:2017 04 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $45,260 $144,180 Not Implemented
OR0691 # 01 Y:2017 01 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,769 $39,442 Not Implemented
OR0691 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,762 $1,200 Implemented
OR0691 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $772 $4,048 Not Implemented
OR0691 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $955 $1,955 Implemented
OR0690 # 01 Y:2017 01 2017 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,526 $429 Not Implemented
OR0690 # 02 Y:2017 02 2017 USE RADIANT HEATER FOR SPOT HEATING $1,989 $1,874 Not Implemented
OR0690 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,285 $2,321 Implemented
OR0688 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,431 $448 Implemented
OR0688 # 02 Y:2017 02 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,221 $180,000 Implemented
OR0688 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,049 $0 Not Implemented
OR0688 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,165 $0 Not Implemented
OR0686 # 01 Y:2017 01 2017 DEVELOP STANDARD OPERATING PROCEDURES $181,947 $31,400 Not Implemented
OR0686 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,219 $0 Not Implemented
OR0686 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,997 $1,200 Not Implemented
OR0686 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,155 $0 Not Implemented
OR0686 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,115 $16,115 Not Implemented
OR0686 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,743 $500 Not Implemented
OR0685 # 01 Y:2017 01 2017 REPAIR AND ELIMINATE STEAM LEAKS $380,108 $83,637 Not Implemented
OR0685 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $90,626 $10,470 Not Implemented
OR0685 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $27,005 $27,335 Not Implemented