Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0114 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,244 | $110 | Not Implemented |
CW0114 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $356 | $90 | Implemented |
CO0739 # 01 Y:2020 | 01 | 2020 | INSTALL OCCUPANCY SENSORS | $5,400 | $11,069 | Not Implemented |
CO0739 # 02 Y:2020 | 02 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,357 | $12,500 | Not Implemented |
CO0739 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $291 | $185 | Implemented |
CO0739 # 04 Y:2020 | 04 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,067 | $0 | Implemented |
CO0739 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $1,541 | $3,605 | Not Implemented |
CO0739 # 06 Y:2020 | 06 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,090 | $0 | Implemented |
NC0654 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,381,024 | $8,000,000 | Not Implemented |
NC0654 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,030 | $75,000 | Not Implemented |
NC0654 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,303 | $20,000 | Not Implemented |
NC0654 # 04 Y:2020 | 04 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,543 | $6,700 | Not Implemented |
NC0654 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,735 | $130,000 | Not Implemented |
AM0815 # 01 Y:2020 | 01 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,330 | $4,570 | Not Implemented |
AM0815 # 02 Y:2020 | 02 | 2020 | OPTIMIZE PLANT POWER FACTOR | $2,600 | $3,770 | Not Implemented |
AM0815 # 03 Y:2020 | 03 | 2020 | USE SYNTHETIC LUBRICANT | $520 | $200 | Implemented |
AM0815 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $210 | $200 | Not Implemented |
MA0824 # 01 Y:2020 | 01 | 2020 | REPLACE BOILER | $15,999 | $29,000 | Not Implemented |
MA0824 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,379 | $54,695 | Not Implemented |
MA0824 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,177 | $29,750 | Implemented |
MA0824 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,118 | $7,710 | Implemented |
MA0824 # 05 Y:2020 | 05 | 2020 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,491 | $6,300 | Implemented |
MZ0302 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,015 | $4,700 | Implemented |
MZ0302 # 02 Y:2020 | 02 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,767 | $14,500 | Not Implemented |
MZ0302 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $251 | $226 | Not Implemented |