IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0258 # 05 Y:2004 05 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $575 $24 Not Implemented
BD0258 # 06 Y:2004 06 2004 INSTALL SPECTRAL REFLECTORS / DELAMP $271 $335 Implemented
BD0258 # 07 Y:2004 07 2004 USE LESS WASTEFUL PACKAGING $1,672 $180 Not Implemented
CO0542 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,390 $600 Implemented
CO0542 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,300 $1,860 Implemented
CO0542 # 03 Y:2004 03 2004 USE SOLAR HEAT TO HEAT WATER $970 $3,780 Not Implemented
CO0542 # 04 Y:2004 04 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $530 $250 Implemented
CO0542 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,380 $52,440 Implemented
CO0542 # 06 Y:2004 06 2004 USE PHOTOCELL CONTROLS $4,900 $18,630 Implemented
MA0550 # 01 Y:2004 01 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $86,929 $32,965 Not Implemented
MA0550 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $15,960 $23,000 Not Implemented
MA0550 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $10,668 $2,066 Not Implemented
MA0550 # 04 Y:2004 04 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $599 $0 Not Implemented
MA0550 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $547 $0 Not Implemented
MA0550 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $185 $120 Not Implemented
SU0186 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $12,704 $0 Implemented
SU0186 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,982 $0 Not Implemented
SU0186 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,485 $1,693 Implemented
SU0186 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,635 $400 Implemented
SU0186 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $938 $298 Not Implemented
SU0186 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $792 $461 Not Implemented
SU0186 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $236 $154 Implemented
SU0186 # 08 Y:2004 08 2004 USE SYNTHETIC LUBRICANT $1,467 $1,000 Implemented
SU0186 # 09 Y:2004 09 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,324 $1,305 Implemented
SF0282 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,198 $0 Implemented