IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0056 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $1,329 $400 Not Implemented
GT0750 # 01 Y:2003 01 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,393 $1,350 Implemented
GT0750 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $226 $400 Implemented
GT0750 # 03 Y:2003 03 2003 CONTROL PRESSURE ON STEAMER OPERATIONS $1,680 $0 Not Implemented
GT0750 # 04 Y:2003 04 2003 USE SYNTHETIC LUBRICANT $6,298 $0 Implemented
GT0750 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $1,058 $372 Implemented
GT0750 # 06 Y:2003 06 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $17,688 $5,200 Not Implemented
GT0750 # 07 Y:2003 07 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,980 $15,000 Not Implemented
GT0750 # 08 Y:2003 08 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,570 $27,000 Not Implemented
GT0750 # 09 Y:2003 09 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,768 $14,000 Implemented
TA0050 # 01 Y:2003 01 2003 UPGRADE CONVEYORS $430,950 $202,900 Not Implemented
TA0050 # 02 Y:2003 02 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $47,100 $5,202 Implemented
TA0050 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,258 $8,100 Implemented
TA0050 # 04 Y:2003 04 2003 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $13,150 $0 Not Implemented
TA0050 # 05 Y:2003 05 2003 UPGRADE OBSOLETE EQUIPMENT $5,795 $11,200 Implemented
TA0050 # 06 Y:2003 06 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,492 $0 Not Implemented
TA0050 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,570 $0 Implemented
TA0050 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,676 $0 Implemented
TA0050 # 09 Y:2003 09 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $390 $0 Not Implemented
TA0050 # 10 Y:2003 10 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $390 $0 Implemented
NC0254 # 01 Y:2003 01 2003 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $639,636 $10,000 n/a
NC0254 # 02 Y:2003 02 2003 INSTALL SENSORS TO DETECT DEFECTS $85,500 $3,000 Implemented
NC0254 # 03 Y:2003 03 2003 MODIFY STARTUP/SHUTDOWN TIMES $1,342,708 $10,000 Implemented
NC0254 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,930 $20,000 Not Implemented
NC0254 # 05 Y:2003 05 2003 COVER OPEN TANKS $14,740 $0 Not Implemented