IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0056 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $1,329 $400 Not Implemented
GT0750 # 01 Y:2003 01 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,393 $1,350 Implemented
GT0750 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $226 $400 Implemented
GT0750 # 03 Y:2003 03 2003 CONTROL PRESSURE ON STEAMER OPERATIONS $1,680 $0 Not Implemented
GT0750 # 04 Y:2003 04 2003 USE SYNTHETIC LUBRICANT $6,298 $0 Implemented
GT0750 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $1,058 $372 Implemented
GT0750 # 06 Y:2003 06 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $17,688 $5,200 Not Implemented
GT0750 # 07 Y:2003 07 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,980 $15,000 Not Implemented
GT0750 # 08 Y:2003 08 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,570 $27,000 Not Implemented
GT0750 # 09 Y:2003 09 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,768 $14,000 Implemented
GT0749 # 01 Y:2003 01 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $233 $0 n/a
GT0749 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $27,457 $0 n/a
GT0749 # 03 Y:2003 03 2003 CHECK FOR ACCURACY OF UTILITY / POWER METERS $21,000 $8,220 n/a
GT0749 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,596 $238,800 n/a
GT0749 # 05 Y:2003 05 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,035 $0 n/a
GT0749 # 06 Y:2003 06 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,160 $0 n/a
GT0749 # 07 Y:2003 07 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $200,750 $814,000 n/a
GT0749 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,444 $500 n/a
OR0428 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $3,901 $7,500 Not Implemented
OR0428 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $307 $0 Implemented
OR0428 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $743 $26 Implemented
OR0428 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $437 $500 Implemented
OR0428 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $742 $1,320 Not Implemented
OR0428 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $688 $2,800 Not Implemented
OR0428 # 07 Y:2003 07 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $400 $1,970 Implemented