Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0638 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,432 | $10,200 | Implemented |
WV0638 # 03 Y:2023 | 03 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,943 | $18,226 | Not Implemented |
WV0638 # 04 Y:2023 | 04 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,424 | $11,600 | Implemented |
WV0638 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $923 | $2,323 | Not Implemented |
WV0638 # 06 Y:2023 | 06 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $674 | $2,060 | Implemented |
WV0638 # 07 Y:2023 | 07 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $631 | $2,910 | Implemented |
WV0638 # 08 Y:2023 | 08 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $484 | $2,350 | Not Implemented |
WV0638 # 09 Y:2023 | 09 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $90 | $100 | Implemented |
UD1053 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,937 | $0 | Not Implemented |
UD1053 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,508 | $19,116 | Not Implemented |
UD1053 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $103,216 | $145,725 | Not Implemented |
UD1053 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,943 | $0 | Not Implemented |
UD1053 # 05 Y:2023 | 05 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $288,790 | $110,000 | Implemented |
UD1053 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $95,100 | $201,500 | Not Implemented |
UD1053 # 07 Y:2023 | 07 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,097 | $110,000 | Implemented |
UD1053 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $7,370 | $110,000 | Implemented |
UD1053 # 09 Y:2023 | 09 | 2023 | OPTIMIZE PLANT POWER FACTOR | $46,233 | $119,156 | Not Implemented |
SU0529 # 01 Y:2023 | 01 | 2023 | DISCONNECT BALLASTS | $670 | $0 | Not Implemented |
SU0529 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,834 | $0 | Not Implemented |
SU0529 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,775 | $250 | Not Implemented |
SU0529 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,688 | $6,050 | Not Implemented |
SU0529 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,544 | $39,388 | Not Implemented |
SU0529 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $158 | $274 | Not Implemented |
SU0529 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,318 | $2,488 | Not Implemented |
SU0529 # 08 Y:2023 | 08 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,392 | $24,000 | Not Implemented |