IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0638 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,432 $10,200 Implemented
WV0638 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,943 $18,226 Not Implemented
WV0638 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,424 $11,600 Implemented
WV0638 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $923 $2,323 Not Implemented
WV0638 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $674 $2,060 Implemented
WV0638 # 07 Y:2023 07 2023 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $631 $2,910 Implemented
WV0638 # 08 Y:2023 08 2023 UPGRADE CONTROLS ON COMPRESSORS $484 $2,350 Not Implemented
WV0638 # 09 Y:2023 09 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $90 $100 Implemented
UD1053 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,937 $0 Not Implemented
UD1053 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,508 $19,116 Not Implemented
UD1053 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $103,216 $145,725 Not Implemented
UD1053 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,943 $0 Not Implemented
UD1053 # 05 Y:2023 05 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $288,790 $110,000 Implemented
UD1053 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,100 $201,500 Not Implemented
UD1053 # 07 Y:2023 07 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,097 $110,000 Implemented
UD1053 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $7,370 $110,000 Implemented
UD1053 # 09 Y:2023 09 2023 OPTIMIZE PLANT POWER FACTOR $46,233 $119,156 Not Implemented
SU0529 # 01 Y:2023 01 2023 DISCONNECT BALLASTS $670 $0 Not Implemented
SU0529 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,834 $0 Not Implemented
SU0529 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,775 $250 Not Implemented
SU0529 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,688 $6,050 Not Implemented
SU0529 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $23,544 $39,388 Not Implemented
SU0529 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $158 $274 Not Implemented
SU0529 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,318 $2,488 Not Implemented
SU0529 # 08 Y:2023 08 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,392 $24,000 Not Implemented