Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0270 # 04 Y:2001 | 04 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $63,100 | $90,000 | Not Implemented |
SD0270 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,077 | $36,000 | Implemented |
SD0270 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $51,823 | $103,000 | Implemented |
SD0270 # 07 Y:2001 | 07 | 2001 | INSTALL SKYLIGHTS | $7,878 | $12,500 | Implemented |
SD0270 # 08 Y:2001 | 08 | 2001 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $983,363 | $3,037,200 | Not Implemented |
SD0270 # 09 Y:2001 | 09 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $32,522 | $5,000 | Implemented |
SD0270 # 10 Y:2001 | 10 | 2001 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $3,170 | $1,500 | Implemented |
SD0270 # 11 Y:2001 | 11 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $648 | $0 | Implemented |
SD0270 # 12 Y:2001 | 12 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $25,910 | $15,000 | Implemented |
SD0270 # 13 Y:2001 | 13 | 2001 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $35,880 | $0 | Implemented |
SD0270 # 14 Y:2001 | 14 | 2001 | $1,393 | $0 | Not Implemented | |
SD0270 # 15 Y:2001 | 15 | 2001 | $65,375 | $30,000 | Not Implemented | |
SD0270 # 16 Y:2001 | 16 | 2001 | $21,296 | $30,000 | Not Implemented | |
LE0103 # 01 Y:2001 | 01 | 2001 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $14,809 | $49,595 | Not Implemented |
LE0103 # 02 Y:2001 | 02 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $16,104 | $0 | Not Implemented |
LE0103 # 03 Y:2001 | 03 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,154 | $1,600 | Implemented |
LE0103 # 04 Y:2001 | 04 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,904 | $12,900 | Implemented |
LE0103 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,676 | $7,500 | Not Implemented |
LE0103 # 06 Y:2001 | 06 | 2001 | $17,100 | $12,300 | Implemented | |
LM0001 # 01 Y:2001 | 01 | 2001 | COMBINE UTILITY METERS | $3,197 | $7,500 | Not Implemented |
LM0001 # 02 Y:2001 | 02 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,249 | $2,745 | Not Implemented |
WV0210 # 01 Y:2001 | 01 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,786 | $448 | Not Implemented |
WV0210 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $710 | $37 | Implemented |
WV0210 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,808 | $730 | Not Implemented |
WV0210 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,198 | $54 | Implemented |