Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0159 # 03 Y:2003 | 03 | 2003 | USE SYNTHETIC LUBRICANT | $1,187 | $800 | Implemented |
SU0159 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,171 | $0 | Implemented |
SU0159 # 05 Y:2003 | 05 | 2003 | REPLACE BOILER | $1,148 | $13,507 | Implemented |
SU0159 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,028 | $0 | Implemented |
SU0159 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $276 | $523 | Implemented |
MA0531 # 01 Y:2003 | 01 | 2003 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $31,336 | $37,543 | n/a |
MA0531 # 02 Y:2003 | 02 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,438 | $43,874 | n/a |
MA0531 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,738 | $6,375 | n/a |
MA0531 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $2,667 | $4,205 | n/a |
MA0531 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,532 | $6,800 | n/a |
MA0531 # 06 Y:2003 | 06 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $445 | $383 | n/a |
UD0665 # 01 Y:2003 | 01 | 2003 | RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION | $380,000 | $38,587 | Not Implemented |
UD0665 # 02 Y:2003 | 02 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $74,995 | $40,000 | Not Implemented |
UD0665 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $14,021 | $1,545 | Not Implemented |
UD0665 # 04 Y:2003 | 04 | 2003 | COVER OPEN TANKS | $7,200 | $12,000 | Not Implemented |
UD0665 # 05 Y:2003 | 05 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,325 | $0 | Implemented |
UD0665 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,561 | $8,112 | Implemented |
UD0665 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,363 | $6,762 | Not Implemented |
UD0665 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,130 | $1,000 | Not Implemented |
UD0665 # 09 Y:2003 | 09 | 2003 | DISCONNECT BALLASTS | $790 | $45 | Implemented |
UD0665 # 10 Y:2003 | 10 | 2003 | COVER OPEN TANKS | $256 | $400 | Implemented |
SD0317 # 01 Y:2003 | 01 | 2003 | UPGRADE OBSOLETE EQUIPMENT | $18,680 | $350 | Not Implemented |
SD0317 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,972 | $15,200 | Not Implemented |
SD0317 # 03 Y:2003 | 03 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,354 | $16 | Not Implemented |
SD0317 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,969 | $200 | Not Implemented |