IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0240 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,368 $0 Not Implemented
BD0240 # 10 Y:2003 10 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,111 $500 Not Implemented
BD0240 # 11 Y:2003 11 2003 USE PHOTOCELL CONTROLS $3,929 $1,250 Implemented
BD0240 # 12 Y:2003 12 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,951 $452 Not Implemented
BD0240 # 13 Y:2003 13 2003 INSTALL OCCUPANCY SENSORS $1,894 $675 Not Implemented
BD0240 # 14 Y:2003 14 2003 ELIMINATE/REDUCE AN OPERATION $33,260 $0 Not Implemented
BD0240 # 15 Y:2003 15 2003 MINIMIZE WATER USAGE $14,330 $400 Implemented
BD0240 # 16 Y:2003 16 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $149,760 $40,000 Not Implemented
BD0240 # 17 Y:2003 17 2003 AUTOMATE FINISHING PROCESS $38,182 $54,800 Not Implemented
BD0240 # 18 Y:2003 18 2003 AUTOMATE PAYROLL SYSTEM $1,144 $2,500 Not Implemented
WI0456 # 01 Y:2003 01 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $20,554 $25,000 Not Implemented
WI0456 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,687 $27,555 Not Implemented
WI0456 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $8,675 $2,014 Not Implemented
WI0456 # 04 Y:2003 04 2003 UTILIZE OUTSIDE CONTRACTING $5,139 $1,240 Not Implemented
WI0456 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,517 $1,605 Not Implemented
WI0456 # 06 Y:2003 06 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,657 $1,000 Not Implemented
UF0334 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,397 $57,060 Implemented
UF0334 # 02 Y:2003 02 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,095 $2,128 Implemented
UF0334 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,612 $0 Implemented
UF0334 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,681 $376 Implemented
UF0334 # 05 Y:2003 05 2003 SEGREGATE SPENT SOLVENTS AND REUSE IN SUBSEQUENT WASHINGS $33,833 $43,600 Implemented
UF0334 # 06 Y:2003 06 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $82,333 $168,000 Implemented
NC0269 # 01 Y:2003 01 2003 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $272,200 $118,250 Implemented
NC0269 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $16,965 $5,128 Implemented
NC0269 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,974 $9,174 Implemented