IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0355 # 09 Y:2004 09 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,817 $1 Not Implemented
IA0355 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,274 $3,116 Not Implemented
IA0355 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $2 Implemented
IA0355 # 12 Y:2004 12 2004 INSTALL OCCUPANCY SENSORS $334 $616 Not Implemented
IA0355 # 13 Y:2004 13 2004 ADD AREA LIGHTING SWITCHES $1,045 $689 Not Implemented
IC0090 # 01 Y:2004 01 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,317 $0 Implemented
IC0090 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,918 $300 Implemented
IC0090 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,932 $425 Not Implemented
IC0090 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,643 $9,400 Implemented
IC0090 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $559 $77 Implemented
IC0090 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,205 $30,427 Not Implemented
CO0556 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,670 $340 Implemented
CO0555 # 01 Y:2004 01 2004 REVISE SMOKE CLEANUP FROM OPERATIONS $4,790 $13,100 Implemented
CO0555 # 02 Y:2004 02 2004 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $900 $580 Implemented
CO0555 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $186 $260 Implemented
CO0555 # 04 Y:2004 04 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $220 $420 Not Implemented
CO0555 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,890 $37,430 Not Implemented
CO0555 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $4,990 Not Implemented
CO0555 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $120 $390 Not Implemented
UU0073 # 01 Y:2004 01 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,250 $8,000 Not Implemented
UU0073 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,080 $860 Not Implemented
UU0073 # 03 Y:2004 03 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $990 $6,000 Not Implemented
UU0073 # 04 Y:2004 04 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,434 $0 Not Implemented
UU0073 # 05 Y:2004 05 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,700 $2,500 Not Implemented
UU0073 # 06 Y:2004 06 2004 $10,500 $15,000 Not Implemented