IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0029 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,953 $54,929 Implemented
MA0737 # 01 Y:2014 01 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,551 $200 Implemented
MA0737 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,120 $8,225 Implemented
MA0737 # 03 Y:2014 03 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,931 $4,020 Not Implemented
MA0737 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $551 $1,688 Implemented
CO0697 # 01 Y:2014 01 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,320 $29,550 Not Implemented
CO0697 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,760 $1,550 Not Implemented
CO0697 # 03 Y:2014 03 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $13,090 $87,610 Not Implemented
CO0697 # 04 Y:2014 04 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $8,560 $38,890 Not Implemented
CO0697 # 05 Y:2014 05 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,000 $500 Not Implemented
CO0697 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,440 $5,180 Not Implemented
DL0134 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,000 $33,600 Implemented
DL0134 # 02 Y:2014 02 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $41,430 $54,000 Implemented
DL0134 # 03 Y:2014 03 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,580 $0 Implemented
DL0134 # 04 Y:2014 04 2014 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $4,630 $5,700 Not Implemented
DL0134 # 05 Y:2014 05 2014 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $54,210 $28,110 Not Implemented
DL0134 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,090 $10,500 Not Implemented
DL0134 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,200 $13,590 Not Implemented
DL0134 # 08 Y:2014 08 2014 METER WASTE WATER $8,610 $8,200 Implemented
UK1409 # 01 Y:2014 01 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $27,758 $15,880 Not Implemented
UK1409 # 02 Y:2014 02 2014 OPTIMIZE PLANT POWER FACTOR $13,858 $7,731 Not Implemented
UK1409 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,135 $456 Not Implemented
UK1409 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,815 $2,358 Not Implemented
UK1409 # 05 Y:2014 05 2014 COMBINE UTILITY METERS $2,250 $831 Not Implemented
UK1409 # 06 Y:2014 06 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,197 $0 Not Implemented