IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0497 # 10 Y:2015 10 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $340 $192 Implemented
BS0047 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $536 $15 Implemented
BS0047 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,127 $32,541 Not Implemented
BS0047 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $1,021 $495 Not Implemented
BS0047 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,278 $200 Not Implemented
BS0047 # 05 Y:2015 05 2015 ADOPT IN-HOUSE MATERIAL GENERATION $38,230 $27,200 Not Implemented
MI0270 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $49,371 $1,400 Not Implemented
MI0270 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $29,534 $20,088 Implemented
MI0270 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $19,500 $80 Implemented
MI0270 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $12,676 $3,600 Implemented
MI0270 # 05 Y:2015 05 2015 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,181 $4,080 Not Implemented
MI0270 # 06 Y:2015 06 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,773 $2,040 Implemented
MI0270 # 07 Y:2015 07 2015 USE OPTIMUM THICKNESS INSULATION $3,506 $1,140 Implemented
MI0270 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,926 $7,869 Implemented
MI0270 # 09 Y:2015 09 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,351 $3,960 Not Implemented
MI0270 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,546 $5,294 Implemented
MI0270 # 11 Y:2015 11 2015 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,475 $560 Not Implemented
MI0270 # 12 Y:2015 12 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,467 $1,660 Implemented
MI0270 # 13 Y:2015 13 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,282 $645 Not Implemented
MI0270 # 14 Y:2015 14 2015 INSTALL OCCUPANCY SENSORS $1,131 $1,220 Not Implemented
MI0270 # 15 Y:2015 15 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $970 $80 Implemented
MA0741 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $131,224 $279,750 Not Implemented
MA0741 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $91,436 $5,000 Not Implemented
MA0741 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,787 $14,025 Not Implemented
MA0741 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,147 $29,732 Not Implemented