Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0243 # 13 Y:2000 | 13 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $17,848 | $35,000 | Not Implemented |
SD0243 # 14 Y:2000 | 14 | 2000 | INSTALL BACK-UP EQUIPMENT | $2,010 | $1,000 | Not Implemented |
DS0161 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,330 | $7,355 | Implemented |
DS0161 # 02 Y:2000 | 02 | 2000 | OPTIMIZE PLANT POWER FACTOR | $1,323 | $1,050 | Implemented |
DS0161 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,603 | $180 | Not Implemented |
DS0161 # 04 Y:2000 | 04 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $1,142 | $2,040 | Implemented |
DS0161 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $758 | $1,130 | Implemented |
DS0161 # 06 Y:2000 | 06 | 2000 | BURN WASTE OIL FOR HEAT | $1,329 | $3,495 | Not Implemented |
DS0161 # 07 Y:2000 | 07 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $1,560 | $3,000 | Not Implemented |
DS0161 # 08 Y:2000 | 08 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,203 | $0 | Implemented |
MA0462 # 01 Y:2000 | 01 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $961,067 | $880,000 | Not Implemented |
MA0462 # 02 Y:2000 | 02 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $194,677 | $430,350 | Not Implemented |
MA0462 # 03 Y:2000 | 03 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $113,014 | $750,000 | Not Implemented |
MA0462 # 04 Y:2000 | 04 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $14,632 | $31,000 | Implemented |
MA0462 # 05 Y:2000 | 05 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $13,500 | $6,000 | Implemented |
MA0462 # 06 Y:2000 | 06 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,580 | $17,000 | Implemented |
MA0462 # 07 Y:2000 | 07 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,757 | $1,200 | Implemented |
MA0462 # 08 Y:2000 | 08 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,467 | $14,000 | Not Implemented |
MA0462 # 09 Y:2000 | 09 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,406 | $1,200 | Implemented |
MA0462 # 10 Y:2000 | 10 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $614 | $3,575 | Implemented |
CO0461 # 01 Y:2000 | 01 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,900 | $2,500 | Not Implemented |
CO0461 # 02 Y:2000 | 02 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,130 | $2,250 | Not Implemented |
CO0461 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $390 | Not Implemented |
CO0461 # 04 Y:2000 | 04 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $520 | $750 | Not Implemented |
CO0461 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20 | $0 | Not Implemented |