Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0373 # 03 Y:2006 | 03 | 2006 | INSTALL OCCUPANCY SENSORS | $13,109 | $1,327 | Implemented |
UF0373 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,178 | $1,272 | Implemented |
UF0373 # 05 Y:2006 | 05 | 2006 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $15,306 | $1,300 | Implemented |
UF0373 # 06 Y:2006 | 06 | 2006 | AIR CONDITION ONLY SPACE NECESSARY | $13,549 | $36,650 | Not Implemented |
UF0373 # 07 Y:2006 | 07 | 2006 | RECYCLE FLUORESCENT LAMPS | $312 | $3,496 | Not Implemented |
UF0373 # 08 Y:2006 | 08 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,448 | $954 | Implemented |
UF0373 # 09 Y:2006 | 09 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $26,438 | $1,500 | Implemented |
WI0505 # 01 Y:2006 | 01 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $105,600 | $2,700 | Implemented |
WI0505 # 02 Y:2006 | 02 | 2006 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $38,400 | $1,000 | Not Implemented |
WI0505 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,774 | $6,289 | Implemented |
WI0505 # 04 Y:2006 | 04 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,380 | $3,200 | Not Implemented |
WI0505 # 05 Y:2006 | 05 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,205 | $7,840 | Implemented |
WI0505 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,153 | $0 | Implemented |
BD0297 # 11 Y:2006 | 11 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $235 | $140 | Implemented |
BD0297 # 12 Y:2006 | 12 | 2006 | RECOVER AND REUSE COOLING WATER | $42,543 | $36,180 | Implemented |
BD0297 # 13 Y:2006 | 13 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $58,145 | $9,400 | Implemented |
BD0298 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,476 | $1,014 | Implemented |
BD0298 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $988 | $140 | Implemented |
BD0298 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $902 | $0 | Not Implemented |
BD0298 # 04 Y:2006 | 04 | 2006 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $436 | $1,200 | Implemented |
BD0298 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $350 | $350 | Implemented |
BD0298 # 06 Y:2006 | 06 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $202 | $370 | Not Implemented |
BD0298 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $169 | $300 | Implemented |
LM0106 # 01 Y:2006 | 01 | 2006 | COVER OPEN TANKS | $3,315 | $1,500 | Implemented |
LM0106 # 02 Y:2006 | 02 | 2006 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $33,590 | $8,640 | Not Implemented |