IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0373 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $13,109 $1,327 Implemented
UF0373 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,178 $1,272 Implemented
UF0373 # 05 Y:2006 05 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $15,306 $1,300 Implemented
UF0373 # 06 Y:2006 06 2006 AIR CONDITION ONLY SPACE NECESSARY $13,549 $36,650 Not Implemented
UF0373 # 07 Y:2006 07 2006 RECYCLE FLUORESCENT LAMPS $312 $3,496 Not Implemented
UF0373 # 08 Y:2006 08 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,448 $954 Implemented
UF0373 # 09 Y:2006 09 2006 IMPROVE SPACE COMFORT CONDITIONING $26,438 $1,500 Implemented
WI0505 # 01 Y:2006 01 2006 IMPROVE SPACE COMFORT CONDITIONING $105,600 $2,700 Implemented
WI0505 # 02 Y:2006 02 2006 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $38,400 $1,000 Not Implemented
WI0505 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,774 $6,289 Implemented
WI0505 # 04 Y:2006 04 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,380 $3,200 Not Implemented
WI0505 # 05 Y:2006 05 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,205 $7,840 Implemented
WI0505 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,153 $0 Implemented
BD0297 # 11 Y:2006 11 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $235 $140 Implemented
BD0297 # 12 Y:2006 12 2006 RECOVER AND REUSE COOLING WATER $42,543 $36,180 Implemented
BD0297 # 13 Y:2006 13 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $58,145 $9,400 Implemented
BD0298 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,476 $1,014 Implemented
BD0298 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $988 $140 Implemented
BD0298 # 03 Y:2006 03 2006 PAY BILLS ON TIME TO AVOID LATE FEES $902 $0 Not Implemented
BD0298 # 04 Y:2006 04 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $436 $1,200 Implemented
BD0298 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $350 Implemented
BD0298 # 06 Y:2006 06 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $202 $370 Not Implemented
BD0298 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $300 Implemented
LM0106 # 01 Y:2006 01 2006 COVER OPEN TANKS $3,315 $1,500 Implemented
LM0106 # 02 Y:2006 02 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $33,590 $8,640 Not Implemented