Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,996
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0082 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $903 | $1,011 | Not Implemented |
BD0082 # 06 Y:1997 | 06 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $793 | $500 | Implemented |
BD0082 # 07 Y:1997 | 07 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $149,301 | $90,400 | Not Implemented |
BD0082 # 08 Y:1997 | 08 | 1997 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $31,643 | $34,000 | Not Implemented |
BD0082 # 09 Y:1997 | 09 | 1997 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $3,344 | $420 | Not Implemented |
BD0082 # 10 Y:1997 | 10 | 1997 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $20,759 | $1,800 | Implemented |
AM0299 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,000 | $80,500 | Implemented |
AM0299 # 02 Y:1997 | 02 | 1997 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $17,850 | $16,760 | Implemented |
AM0299 # 03 Y:1997 | 03 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,500 | $29,520 | Implemented |
AM0299 # 04 Y:1997 | 04 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,700 | $8,000 | Implemented |
AM0299 # 05 Y:1997 | 05 | 1997 | ADD AREA LIGHTING SWITCHES | $2,070 | $560 | Implemented |
AM0299 # 06 Y:1997 | 06 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,860 | $0 | Not Implemented |
AM0299 # 07 Y:1997 | 07 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,230 | $1,140 | Not Implemented |
AM0299 # 08 Y:1997 | 08 | 1997 | USE SYNTHETIC LUBRICANT | $520 | $0 | Implemented |
AM0299 # 09 Y:1997 | 09 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $290 | $200 | Implemented |
DS0090 # 01 Y:1997 | 01 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,097 | $1,800 | Implemented |
DS0090 # 02 Y:1997 | 02 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,210 | $1,910 | Implemented |
DS0090 # 03 Y:1997 | 03 | 1997 | COVER OPEN TANKS | $634 | $242 | Not Implemented |
DS0090 # 04 Y:1997 | 04 | 1997 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $16,937 | $20,000 | Implemented |
DS0090 # 05 Y:1997 | 05 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $10,196 | $32,400 | Not Implemented |
DS0090 # 06 Y:1997 | 06 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $13,735 | $9,500 | Implemented |
DS0090 # 07 Y:1997 | 07 | 1997 | REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS | $13,750 | $19,000 | Implemented |
DS0090 # 08 Y:1997 | 08 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $70,200 | $65,000 | Implemented |
DS0091 # 01 Y:1997 | 01 | 1997 | INSTALL OCCUPANCY SENSORS | $886 | $900 | Not Implemented |
DS0091 # 02 Y:1997 | 02 | 1997 | INSULATE BARE EQUIPMENT | $3,234 | $882 | Implemented |