IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0082 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $1,011 Not Implemented
BD0082 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $793 $500 Implemented
BD0082 # 07 Y:1997 07 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $149,301 $90,400 Not Implemented
BD0082 # 08 Y:1997 08 1997 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $31,643 $34,000 Not Implemented
BD0082 # 09 Y:1997 09 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,344 $420 Not Implemented
BD0082 # 10 Y:1997 10 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $20,759 $1,800 Implemented
AM0299 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,000 $80,500 Implemented
AM0299 # 02 Y:1997 02 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $17,850 $16,760 Implemented
AM0299 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,500 $29,520 Implemented
AM0299 # 04 Y:1997 04 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,700 $8,000 Implemented
AM0299 # 05 Y:1997 05 1997 ADD AREA LIGHTING SWITCHES $2,070 $560 Implemented
AM0299 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,860 $0 Not Implemented
AM0299 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $1,140 Not Implemented
AM0299 # 08 Y:1997 08 1997 USE SYNTHETIC LUBRICANT $520 $0 Implemented
AM0299 # 09 Y:1997 09 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $200 Implemented
DS0090 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,097 $1,800 Implemented
DS0090 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,210 $1,910 Implemented
DS0090 # 03 Y:1997 03 1997 COVER OPEN TANKS $634 $242 Not Implemented
DS0090 # 04 Y:1997 04 1997 UTILIZE A LESS EXPENSIVE COOLING METHOD $16,937 $20,000 Implemented
DS0090 # 05 Y:1997 05 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,196 $32,400 Not Implemented
DS0090 # 06 Y:1997 06 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $13,735 $9,500 Implemented
DS0090 # 07 Y:1997 07 1997 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $13,750 $19,000 Implemented
DS0090 # 08 Y:1997 08 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $70,200 $65,000 Implemented
DS0091 # 01 Y:1997 01 1997 INSTALL OCCUPANCY SENSORS $886 $900 Not Implemented
DS0091 # 02 Y:1997 02 1997 INSULATE BARE EQUIPMENT $3,234 $882 Implemented