Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,996
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DS0091 # 03 Y:1997 | 03 | 1997 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $121,380 | $250,000 | Implemented |
DS0091 # 04 Y:1997 | 04 | 1997 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $760 | $800 | Not Implemented |
DS0091 # 05 Y:1997 | 05 | 1997 | USE OTHER WASTE CONCENTRATION METHODS | $1,784 | $10,000 | Not Implemented |
DS0091 # 06 Y:1997 | 06 | 1997 | REDUCE DELIVERY SCHEDULES | $71,460 | $50,000 | Implemented |
HO0155 # 09 Y:1997 | 09 | 1997 | USE HIGH PRESSURE WASH SYSTEMS | $33,480 | $1,000 | Not Implemented |
HO0155 # 10 Y:1997 | 10 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $6,000 | $500 | Implemented |
HO0155 # 11 Y:1997 | 11 | 1997 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $9,500 | $100 | Implemented |
CO0385 # 01 Y:1997 | 01 | 1997 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,360 | $6,100 | Implemented |
CO0385 # 02 Y:1997 | 02 | 1997 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,510 | $400 | Implemented |
CO0385 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,180 | $320 | Implemented |
CO0385 # 04 Y:1997 | 04 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $197 | $322 | Implemented |
CO0385 # 05 Y:1997 | 05 | 1997 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $6,410 | $13,700 | Implemented |
CO0385 # 06 Y:1997 | 06 | 1997 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,370 | $420 | Implemented |
CO0385 # 07 Y:1997 | 07 | 1997 | CONVERT TO ELECTROSTATIC POWDER COATING | $105,860 | $99,400 | Implemented |
CO0385 # 08 Y:1997 | 08 | 1997 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $8,650 | $10,000 | Not Implemented |
DS0088 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,136 | $75 | Implemented |
DS0088 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,164 | $5,126 | Not Implemented |
DS0088 # 03 Y:1997 | 03 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $28,000 | $4,500 | Implemented |
DS0088 # 04 Y:1997 | 04 | 1997 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $82,160 | $340 | Not Implemented |
DS0089 # 01 Y:1997 | 01 | 1997 | OPTIMIZE PLANT POWER FACTOR | $7,041 | $1,750 | Implemented |
DS0089 # 02 Y:1997 | 02 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $296 | $450 | Not Implemented |
DS0089 # 03 Y:1997 | 03 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,298 | $1,100 | Implemented |
DS0089 # 04 Y:1997 | 04 | 1997 | FILTER AND REUSE HYDRAULIC OIL | $670 | $0 | Not Implemented |
DS0089 # 05 Y:1997 | 05 | 1997 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $8,273 | $7,500 | Not Implemented |
DS0089 # 06 Y:1997 | 06 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $41,641 | $2,315 | Implemented |