IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0797 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,893 $3,800 Implemented
GT0797 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,440 $1,500 Implemented
GT0797 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $121,511 $243,073 Implemented
GT0797 # 04 Y:2005 04 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,210 $17,150 Not Implemented
GT0797 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,100 $500 Implemented
GT0797 # 06 Y:2005 06 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,716 $400 Implemented
GT0797 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,447 $3,692 Implemented
IA0359 # 01 Y:2005 01 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,800 $6,352 Not Implemented
IA0359 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $774 $76 Implemented
IA0359 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,024 $790 Implemented
IA0359 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $3,593 $500 Not Implemented
IA0359 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $518 $30,000 Implemented
IA0359 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $299 $504 Implemented
IA0359 # 07 Y:2005 07 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $1,436 $1,000 Implemented
IA0359 # 08 Y:2005 08 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,866 $1,223 Not Implemented
IC0094 # 01 Y:2005 01 2005 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $28,301 $54,519 Not Implemented
IC0094 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,962 $6,778 Not Implemented
IC0094 # 03 Y:2005 03 2005 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $24,437 $32,056 Implemented
IC0094 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,623 $3,900 Implemented
IC0094 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $992 $890 Not Implemented
IC0094 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,200 $0 Not Implemented
IC0094 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,655 $2,640 Not Implemented
IC0094 # 08 Y:2005 08 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,394 $5,123 Not Implemented
LE0207 # 01 Y:2005 01 2005 REPLACE BOILER $109,438 $9,760 Implemented
LE0207 # 02 Y:2005 02 2005 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $72,942 $500 Not Implemented