IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0500 # 04 Y:2006 04 2006 INSTALL AUTOMATIC PACKING EQUIPMENT $30,500 $272 Not Implemented
AM0500 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $6,900 $6,900 Implemented
AM0500 # 06 Y:2006 06 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,520 $0 Not Implemented
AM0500 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,800 $0 Implemented
AM0500 # 08 Y:2006 08 2006 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $430 $0 Implemented
AM0500 # 09 Y:2006 09 2006 USE SYNTHETIC LUBRICANT $422 $0 Not Implemented
AM0500 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $343 $192 Implemented
OK0719 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,779 $157,975 Not Implemented
OK0719 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $13,491 $550 Implemented
OK0719 # 03 Y:2006 03 2006 USE OPTIMUM THICKNESS INSULATION $3,078 $1,637 Implemented
OK0719 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $249 $1,098 Not Implemented
OK0719 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $282 $80 Implemented
OK0719 # 06 Y:2006 06 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $221 $225 Implemented
OK0719 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $49 $92 Not Implemented
LM0105 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $638 $0 Not Implemented
LM0105 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,156 $960 Implemented
LM0105 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,197 $250 Implemented
LM0105 # 04 Y:2006 04 2006 DEVELOP STANDARD OPERATING PROCEDURES $48,035 $1,500 Implemented
LM0105 # 05 Y:2006 05 2006 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,978 $1,000 Implemented
LM0107 # 01 Y:2006 01 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,522 $2,400 Not Implemented
LM0107 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,219 $2,200 Implemented
LM0107 # 03 Y:2006 03 2006 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $225,208 $12,980 Implemented
LM0107 # 04 Y:2006 04 2006 DEVELOP STANDARD OPERATING PROCEDURES $178,334 $5,400 Implemented
LM0107 # 05 Y:2006 05 2006 ADOPT IN-HOUSE MATERIAL GENERATION $16,864 $1,000 Implemented
LM0107 # 06 Y:2006 06 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $20,251 $1,000 Implemented