Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160,834
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0292 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $130,075 | $1,202,972 | Not Implemented |
IC0292 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,838 | $0 | Not Implemented |
IC0292 # 06 Y:2024 | 06 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,786 | $0 | Implemented |
IC0292 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $19,216 | $10,388 | Implemented |
IC0292 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $20,681 | $163,749 | Not Implemented |
WM0206 # 01 Y:2024 | 01 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $1,637 | $6,780 | n/a |
WM0206 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $1,568 | $787 | n/a |
WM0206 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $297 | $125 | n/a |
WM0206 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $261 | $0 | n/a |
UA0278 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $83,920 | $6,036 | n/a |
UA0278 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,473 | $64,976 | n/a |
UA0278 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $9,308 | $327 | n/a |
UA0278 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,819 | $1,680 | n/a |
UA0278 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,935 | $1,000 | n/a |
UA0278 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,416 | $8,163 | n/a |
UA0278 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $777 | $4,000 | n/a |
UA0278 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $1,770 | $1,055 | n/a |
MU0041 # 01 Y:2023 | 01 | 2023 | INSTALL AUTOMATIC STACK DAMPER | $4,161 | $959 | Implemented |
MU0041 # 02 Y:2023 | 02 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,074 | $844 | Not Implemented |
MU0041 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,806 | $25,843 | Implemented |
MU0041 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,396 | $6,403 | Implemented |
MU0041 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $673 | $240 | Implemented |
MU0041 # 06 Y:2023 | 06 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,235 | $100,548 | Implemented |
MU0041 # 07 Y:2023 | 07 | 2023 | INSTALL SET-BACK TIMERS | $86,283 | $371,500 | Implemented |
MU0041 # 08 Y:2023 | 08 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,605 | $0 | Implemented |