IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0609 # 04 Y:1997 04 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $8,030 $20,880 Not Implemented
TN0609 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $5,330 $6,200 Implemented
TN0609 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $860 $600 Not Implemented
UD0516 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,109 $14,870 Not Implemented
UD0516 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,524 $8,150 Implemented
UD0516 # 03 Y:1997 03 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,785 $1,200 Not Implemented
UD0516 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,205 $978 Implemented
UD0516 # 05 Y:1997 05 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,669 $500 Not Implemented
WV0116 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,254 $439 Implemented
WV0116 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $220 $600 Not Implemented
WV0116 # 03 Y:1997 03 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,312 $2,000 Implemented
WV0116 # 04 Y:1997 04 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,636 $11,600 Not Implemented
WV0116 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $262 $268 Implemented
WV0116 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,025 $0 Implemented
WV0116 # 07 Y:1997 07 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,500 $5,000 Not Implemented
WV0116 # 08 Y:1997 08 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $189,000 $2,360 Not Implemented
WI0296 # 01 Y:1997 01 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $24,000 $19,000 Not Implemented
WI0296 # 02 Y:1997 02 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,364 $5,400 Implemented
WI0296 # 03 Y:1997 03 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,796 $0 Not Implemented
WI0296 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,479 $6,750 Not Implemented
WI0296 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $725 $1,608 Implemented
WI0296 # 06 Y:1997 06 1997 REDUCE VENTILATION AIR $699 $500 Implemented
WI0296 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $617 $640 Not Implemented
WI0296 # 08 Y:1997 08 1997 MINIMIZE WATER USAGE $1,473 $900 Implemented
SF0115 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $492 $546 Not Implemented