IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0258 # 13 Y:2003 13 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,945 $250 Implemented
LM0054 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,854 $1,545 Implemented
LM0054 # 02 Y:2003 02 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,770 $0 Implemented
LM0054 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,079 $410 Implemented
LM0054 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,410 $1,000 Implemented
LM0054 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $346 $0 Implemented
LM0054 # 06 Y:2003 06 2003 COVER OPEN TANKS $3,464 $420 Implemented
LM0054 # 07 Y:2003 07 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,472 $4,000 Not Implemented
LM0054 # 08 Y:2003 08 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $316 $400 Implemented
CO0521 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $65,190 $82,000 Not Implemented
CO0521 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,840 $5,100 Not Implemented
CO0521 # 03 Y:2003 03 2003 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,010 $1,400 Implemented
CO0521 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $200 Implemented
CO0521 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,650 $3,532 Not Implemented
CO0521 # 06 Y:2003 06 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $48,290 $175,000 Not Implemented
GT0752 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,786 $500 Implemented
GT0752 # 02 Y:2003 02 2003 IMPROVE LUBRICATION PRACTICES $3,514 $0 Not Implemented
GT0752 # 03 Y:2003 03 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,459 $2,000 Not Implemented
GT0752 # 04 Y:2003 04 2003 COVER OPEN TANKS $308,000 $361,000 Implemented
GT0752 # 05 Y:2003 05 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $211,700 $260,000 Not Implemented
GT0752 # 06 Y:2003 06 2003 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $1,221,000 $0 Not Implemented
GT0752 # 07 Y:2003 07 2003 UPGRADE OBSOLETE EQUIPMENT $129,140 $1,200,000 Implemented
GT0752 # 08 Y:2003 08 2003 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $1,773,429 $6,000,000 n/a
GT0752 # 09 Y:2003 09 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $435,100 $2,070,000 Not Implemented
MA0529 # 01 Y:2003 01 2003 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $132,710 $407,000 n/a