IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0204 # 07 Y:2005 07 2005 USE SYNTHETIC LUBRICANT $3,145 $2,000 Implemented
SU0204 # 08 Y:2005 08 2005 OPTIMIZE PLANT POWER FACTOR $3,731 $11,931 Not Implemented
UU0081 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,948 $2,000 Not Implemented
UU0081 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,684 $6,171 Not Implemented
UU0081 # 03 Y:2005 03 2005 INSTALL COMMON HEADER ON COMPRESSORS $1,717 $1,270 Not Implemented
UU0081 # 04 Y:2005 04 2005 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $2,724 $11,700 Not Implemented
UU0081 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,000 $500 Not Implemented
UU0081 # 06 Y:2005 06 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $996,810 $10,000,000 Not Implemented
UU0081 # 07 Y:2005 07 2005 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $117 $0 Not Implemented
WI0484 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,843 $44,480 Not Implemented
WI0484 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $2,603 $3,060 Not Implemented
WI0484 # 03 Y:2005 03 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $14,141 $60,000 Not Implemented
WI0484 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,391 $5,500 Not Implemented
WI0484 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,240 $500 Not Implemented
WI0484 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,787 $400 Not Implemented
WI0484 # 07 Y:2005 07 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,880 $11,000 Not Implemented
WI0484 # 08 Y:2005 08 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,010 $0 Not Implemented
WI0484 # 09 Y:2005 09 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,689 $0 Not Implemented
WI0484 # 10 Y:2005 10 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,942 $1,054 Not Implemented
NC0309 # 01 Y:2005 01 2005 ADD ADDITIONAL PRODUCTION SHIFT $89,630 $5,000 Implemented
NC0309 # 02 Y:2005 02 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,148 $21,000 Implemented
NC0309 # 03 Y:2005 03 2005 MAKE A NEW BY-PRODUCT $15,600 $1,000 Not Implemented
NC0309 # 04 Y:2005 04 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,268 $6,500 Implemented
NC0309 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,767 $100 Implemented
OK0702 # 01 Y:2005 01 2005 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $22,000 $6,600 Not Implemented