Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,403
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0266 # 08 Y:1996 | 08 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $440 | $0 | Implemented |
NC0081 # 01 Y:1996 | 01 | 1996 | DISCONNECT BALLASTS | $800 | $2,060 | Implemented |
NC0081 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,438 | $17,250 | Implemented |
NC0081 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,043 | $53,739 | Implemented |
NC0081 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $558 | $480 | Implemented |
NC0081 # 05 Y:1996 | 05 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,626 | $2,640 | Implemented |
NC0081 # 06 Y:1996 | 06 | 1996 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $9,258 | $25,000 | Implemented |
NC0081 # 07 Y:1996 | 07 | 1996 | AIR CONDITION ONLY SPACE NECESSARY | $968 | $1,500 | Not Implemented |
NC0081 # 08 Y:1996 | 08 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,816 | $0 | Not Implemented |
NC0081 # 09 Y:1996 | 09 | 1996 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $9,000 | $8,000 | Not Implemented |
NC0081 # 10 Y:1996 | 10 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,170 | $25,000 | Not Implemented |
MA0364 # 01 Y:1996 | 01 | 1996 | ADOPT IN-HOUSE MATERIAL GENERATION | $20,546 | $119,500 | Not Implemented |
MA0364 # 02 Y:1996 | 02 | 1996 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $5,996 | $2,009 | Not Implemented |
MA0364 # 03 Y:1996 | 03 | 1996 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $652 | $12,000 | Not Implemented |
MA0364 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,606 | $0 | Not Implemented |
MA0364 # 05 Y:1996 | 05 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,454 | $900 | Not Implemented |
MA0364 # 06 Y:1996 | 06 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $755 | $4,800 | Not Implemented |
MA0364 # 07 Y:1996 | 07 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $477 | $1,100 | Implemented |
MA0364 # 08 Y:1996 | 08 | 1996 | REDUCE VENTILATION AIR | $360 | $0 | Not Implemented |
MA0364 # 09 Y:1996 | 09 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $297 | $0 | Implemented |
MA0364 # 10 Y:1996 | 10 | 1996 | INSTALL OCCUPANCY SENSORS | $171 | $237 | Not Implemented |
OK0496 # 01 Y:1996 | 01 | 1996 | PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS | $32,272 | $140,000 | Implemented |
OK0496 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,549 | $3,017 | Implemented |
OK0496 # 03 Y:1996 | 03 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,697 | $8,963 | Implemented |
OK0496 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,930 | $300 | Not Implemented |