IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0702 # 02 Y:2005 02 2005 USE POWER DURING OFF-PEAK PERIODS $21,518 $6,899 Not Implemented
OK0702 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $1,148 $582 Not Implemented
OK0702 # 04 Y:2005 04 2005 INSTALL SET-BACK TIMERS $896 $1,540 Not Implemented
OK0702 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $234 $530 Implemented
OK0702 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $725 $480 Not Implemented
OK0702 # 07 Y:2005 07 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,165 $36,140 Not Implemented
UD0711 # 01 Y:2005 01 2005 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $343,339 $10,000 Not Implemented
UD0711 # 02 Y:2005 02 2005 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $143,601 $246,784 Not Implemented
UD0711 # 03 Y:2005 03 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $113,328 $400,000 Not Implemented
UD0711 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,341 $80,215 Not Implemented
UD0711 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,813 $2,025 Implemented
UD0711 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,651 $1,240 Implemented
UD0711 # 07 Y:2005 07 2005 UPGRADE CONTROLS ON COMPRESSORS $4,427 $600 Not Implemented
UD0711 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $1,305 $3,530 Implemented
UD0710 # 01 Y:2005 01 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $215,424 $120,000 Implemented
UD0710 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,746 $56,952 Implemented
UD0710 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $8,824 $9,000 Not Implemented
UD0710 # 04 Y:2005 04 2005 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,908 $2,080 Not Implemented
UD0710 # 05 Y:2005 05 2005 UPGRADE CONTROLS ON COMPRESSORS $3,385 $0 Not Implemented
UD0710 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,911 $500 Not Implemented
UD0710 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,172 $2,964 Implemented
UD0710 # 08 Y:2005 08 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $717 $0 Implemented
NC0308 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,359 $20,313 Implemented
NC0308 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,017 $2,450 Implemented
NC0308 # 03 Y:2005 03 2005 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $15,600 $1,000 Not Implemented