IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0083 # 04 Y:1997 04 1997 BURN WASTE OIL FOR HEAT $1,022 $1,995 Not Implemented
MS0083 # 05 Y:1997 05 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $480,511 $9,400 Not Implemented
KG0087 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,696 $75 n/a
KG0087 # 02 Y:1997 02 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,241 $290 n/a
KG0087 # 03 Y:1997 03 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,809 $1,200 n/a
KG0087 # 04 Y:1997 04 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,689 $1,050 n/a
KG0087 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $771 $341 n/a
KG0087 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $33,414 $0 n/a
KG0087 # 07 Y:1997 07 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $11,385 $360 n/a
KG0087 # 08 Y:1997 08 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $2,822,400 $686,200 n/a
KG0087 # 09 Y:1997 09 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $646,464 $0 n/a
HO0154 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,944 $21,668 Implemented
HO0154 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $178 $575 Not Implemented
HO0154 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,425 $3,182 Not Implemented
HO0154 # 04 Y:1997 04 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $15,600 $10,800 Not Implemented
HO0154 # 05 Y:1997 05 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $117,000 $525,000 Not Implemented
HO0154 # 06 Y:1997 06 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $2,563 $10,000 Implemented
IA0164 # 01 Y:1997 01 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $32,289 $800 Implemented
IA0164 # 02 Y:1997 02 1997 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $17,815 $19,000 Not Implemented
IA0164 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $898 Implemented
IA0164 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,481 $268 Implemented
IA0164 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,647 $20 Implemented
IA0164 # 06 Y:1997 06 1997 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,860 $1,788 Implemented
IA0164 # 07 Y:1997 07 1997 CONVERT TO ELECTROSTATIC POWDER COATING $4,848 $8,000 Implemented
IA0164 # 08 Y:1997 08 1997 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $5,894 $100 Implemented