Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0101 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,840 | $6,234 | Not Implemented |
LL0101 # 04 Y:2001 | 04 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $153 | $268 | Implemented |
LL0101 # 05 Y:2001 | 05 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $248 | $424 | Implemented |
LL0101 # 06 Y:2001 | 06 | 2001 | REDUCE SCRAP PRODUCTION | $1,788 | $0 | Implemented |
NC0209 # 01 Y:2001 | 01 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,845 | $5,600 | Not Implemented |
NC0209 # 02 Y:2001 | 02 | 2001 | UPGRADE CONTROLS ON COMPRESSORS | $2,519 | $5,600 | Implemented |
NC0209 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,161 | $5,700 | Not Implemented |
NC0209 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $163 | $200 | Implemented |
NC0209 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,886 | $2,360 | Implemented |
NC0209 # 06 Y:2001 | 06 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $675 | $200 | Not Implemented |
CO0481 # 01 Y:2001 | 01 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,690 | $2,000 | Not Implemented |
CO0481 # 02 Y:2001 | 02 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,370 | $0 | Implemented |
CO0481 # 03 Y:2001 | 03 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,230 | $880 | Implemented |
CO0481 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,030 | $0 | Implemented |
CO0481 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $870 | $130 | Implemented |
CO0481 # 06 Y:2001 | 06 | 2001 | USE OPTIMUM TEMPERATURE | $820 | $2,330 | Implemented |
CO0481 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $480 | $30 | Not Implemented |
CO0481 # 08 Y:2001 | 08 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $300 | $130 | Implemented |
CO0481 # 09 Y:2001 | 09 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $160 | $0 | Implemented |
SD0269 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $97,717 | $166,000 | Not Implemented |
SD0269 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $41,894 | $58,000 | Not Implemented |
SD0269 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,230 | $1,700 | Not Implemented |
SD0269 # 04 Y:2001 | 04 | 2001 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,921 | $0 | Implemented |
SD0269 # 05 Y:2001 | 05 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,060 | $7,900 | Implemented |
SD0269 # 06 Y:2001 | 06 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $158,400 | $2,500 | Implemented |