IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0101 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,840 $6,234 Not Implemented
LL0101 # 04 Y:2001 04 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $153 $268 Implemented
LL0101 # 05 Y:2001 05 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $248 $424 Implemented
LL0101 # 06 Y:2001 06 2001 REDUCE SCRAP PRODUCTION $1,788 $0 Implemented
NC0209 # 01 Y:2001 01 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,845 $5,600 Not Implemented
NC0209 # 02 Y:2001 02 2001 UPGRADE CONTROLS ON COMPRESSORS $2,519 $5,600 Implemented
NC0209 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,161 $5,700 Not Implemented
NC0209 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $163 $200 Implemented
NC0209 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,886 $2,360 Implemented
NC0209 # 06 Y:2001 06 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $675 $200 Not Implemented
CO0481 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,690 $2,000 Not Implemented
CO0481 # 02 Y:2001 02 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,370 $0 Implemented
CO0481 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,230 $880 Implemented
CO0481 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,030 $0 Implemented
CO0481 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $130 Implemented
CO0481 # 06 Y:2001 06 2001 USE OPTIMUM TEMPERATURE $820 $2,330 Implemented
CO0481 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $480 $30 Not Implemented
CO0481 # 08 Y:2001 08 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $300 $130 Implemented
CO0481 # 09 Y:2001 09 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $160 $0 Implemented
SD0269 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $97,717 $166,000 Not Implemented
SD0269 # 02 Y:2001 02 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $41,894 $58,000 Not Implemented
SD0269 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,230 $1,700 Not Implemented
SD0269 # 04 Y:2001 04 2001 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,921 $0 Implemented
SD0269 # 05 Y:2001 05 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,060 $7,900 Implemented
SD0269 # 06 Y:2001 06 2001 $158,400 $2,500 Implemented