Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,215
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0918 # 06 Y:2015 | 06 | 2015 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $11,416 | $23,545 | Not Implemented |
UD0918 # 07 Y:2015 | 07 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,952 | $45,000 | Not Implemented |
UD0918 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,773 | $4,785 | Implemented |
UD0918 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $537 | $1,000 | Implemented |
UM0452 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,871 | $1,000 | Not Implemented |
UM0452 # 02 Y:2015 | 02 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,393 | $2,500 | Implemented |
UM0452 # 03 Y:2015 | 03 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $28,779 | $28,000 | Implemented |
UM0452 # 04 Y:2015 | 04 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,903 | $4,000 | Implemented |
WM0060 # 01 Y:2015 | 01 | 2015 | REPLACE BOILER | $24,302 | $20,000 | Not Implemented |
WM0060 # 02 Y:2015 | 02 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,761 | $2,291 | Implemented |
WM0060 # 03 Y:2015 | 03 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,355 | $0 | Implemented |
WM0060 # 04 Y:2015 | 04 | 2015 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $3,701 | $1,218 | Implemented |
WM0060 # 05 Y:2015 | 05 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $1,080 | $110 | Implemented |
WM0060 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $786 | $3,000 | Implemented |
WM0060 # 07 Y:2015 | 07 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $680 | $255 | Implemented |
LE0387 # 01 Y:2015 | 01 | 2015 | INSTALL OCCUPANCY SENSORS | $1,375 | $0 | Not Implemented |
LE0387 # 02 Y:2015 | 02 | 2015 | ADJUST VENTS TO MINIMIZE ENERGY USE | $163,566 | $7,716 | Not Implemented |
LE0387 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,549 | $1,000 | Not Implemented |
LE0387 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $67,292 | $22,580 | Not Implemented |
LE0387 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,707 | $2,050 | Not Implemented |
LE0387 # 06 Y:2015 | 06 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $83,193 | $86,300 | Not Implemented |
LE0387 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,929 | $14,175 | Not Implemented |
LE0387 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,919 | $23,100 | Not Implemented |
CO0699 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,690 | $290 | Implemented |
CO0699 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,720 | $13,660 | Not Implemented |