Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,738
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0834 # 09 Y:2012 | 09 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,100 | $0 | Not Implemented |
TT0096 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $463 | $0 | Implemented |
TT0096 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,193 | $1,753 | Not Implemented |
TT0096 # 03 Y:2012 | 03 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $26,105 | $10,000 | Implemented |
TT0096 # 04 Y:2012 | 04 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $1,892 | $1,000 | Implemented |
TT0096 # 05 Y:2012 | 05 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,900 | $2,000 | Not Implemented |
TT0096 # 06 Y:2012 | 06 | 2012 | RECOVER AND REUSE WASTE MATERIAL | $330,000 | $630,000 | Not Implemented |
OK0833 # 01 Y:2012 | 01 | 2012 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,700 | $5,000 | Implemented |
OK0833 # 02 Y:2012 | 02 | 2012 | INSULATE BARE EQUIPMENT | $4,000 | $2,000 | Not Implemented |
OK0833 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $1,600 | $2,500 | Not Implemented |
OK0833 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,000 | $500 | Implemented |
OK0833 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,800 | $4,050 | Not Implemented |
OK0833 # 06 Y:2012 | 06 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,900 | $14,000 | Not Implemented |
OK0833 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,150 | $24,000 | Not Implemented |
OK0833 # 08 Y:2012 | 08 | 2012 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $31,700 | $0 | Implemented |
OK0833 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $460 | $3,400 | Implemented |
TT0094 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,034 | $0 | Not Implemented |
TT0094 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $742 | $0 | Not Implemented |
TT0094 # 03 Y:2012 | 03 | 2012 | DISCONNECT BALLASTS | $872 | $0 | Not Implemented |
TT0094 # 04 Y:2012 | 04 | 2012 | ISOLATE HOT OR COLD EQUIPMENT | $3,658 | $150 | Not Implemented |
TT0094 # 05 Y:2012 | 05 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $12,041 | $2,000 | Not Implemented |
TT0094 # 06 Y:2012 | 06 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,111 | $150 | Not Implemented |
TT0094 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $9,871 | $2,250 | Not Implemented |
TT0094 # 08 Y:2012 | 08 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $42,760 | $8,000 | Not Implemented |
TT0094 # 09 Y:2012 | 09 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $2,473 | $1,600 | Not Implemented |