Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0189 # 05 Y:2021 | 05 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,609 | $100 | Implemented |
UU0189 # 06 Y:2021 | 06 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $403 | $100 | Implemented |
UU0188 # 01 Y:2021 | 01 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $83,964 | $377,320 | Implemented |
UU0188 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $5,049 | $6,500 | Not Implemented |
UU0188 # 03 Y:2021 | 03 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,446 | $14,800 | Implemented |
UU0188 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,107 | $1,876 | Not Implemented |
UU0188 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $788 | $3,863 | Implemented |
UU0188 # 06 Y:2021 | 06 | 2021 | SIZE TRUCKS TO JOB | $10,780 | $56,000 | Not Implemented |
UU0187 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $9,400 | $14,500 | Not Implemented |
UU0187 # 02 Y:2021 | 02 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,910 | $10,200 | Not Implemented |
UU0187 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $735 | $1,470 | Implemented |
UU0187 # 04 Y:2021 | 04 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $750 | $870 | Not Implemented |
UU0186 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,919 | $19,705 | Implemented |
UU0186 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,932 | $15,000 | Not Implemented |
UU0186 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,796 | $4,794 | Not Implemented |
UU0186 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $822 | $1,645 | Implemented |
UU0186 # 05 Y:2021 | 05 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $544 | $200 | Implemented |
UU0186 # 06 Y:2021 | 06 | 2021 | ADD AREA LIGHTING SWITCHES | $398 | $883 | Implemented |
UU0185 # 01 Y:2021 | 01 | 2021 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $21,754 | $64,000 | Not Implemented |
UU0185 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,198 | $3,400 | Implemented |
UU0185 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,814 | $14,000 | Implemented |
UU0185 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,525 | $11,563 | Implemented |
UU0185 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,960 | $908 | Not Implemented |
UU0185 # 06 Y:2021 | 06 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,535 | $2,600 | Not Implemented |
UU0185 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $491 | $255 | Implemented |