IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0313 # 09 Y:2001 09 2001 $49,133 $8,028 Implemented
MA0499 # 01 Y:2001 01 2001 $268,341 $500,000 Not Implemented
MA0499 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $45,270 $154,000 Not Implemented
MA0499 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,963 $9,960 Not Implemented
MA0499 # 04 Y:2001 04 2001 USE MINIMUM SAFE OVEN VENTILATION $7,334 $14,200 Not Implemented
MA0499 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $5,936 $12,650 Not Implemented
MA0499 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,235 $255 Not Implemented
MA0499 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,219 $2,000 Not Implemented
MS0191 # 01 Y:2001 01 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $35,695 $1,000 Implemented
MS0191 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,525 $1,000 Implemented
MS0191 # 03 Y:2001 03 2001 PREHEAT COMBUSTION AIR WITH WASTE HEAT $67,125 $17,280 Not Implemented
MS0191 # 04 Y:2001 04 2001 PREHEAT COMBUSTION AIR WITH WASTE HEAT $14,314 $5,040 Not Implemented
MS0191 # 05 Y:2001 05 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $5,216 $7,600 Not Implemented
MS0191 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,218 $367 Not Implemented
MS0191 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $448 $302 Not Implemented
MS0191 # 08 Y:2001 08 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,135 $2,916 Not Implemented
SU0105 # 01 Y:2001 01 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,365 $0 Implemented
SU0105 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $1,285 $38 Not Implemented
SU0105 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $993 $123 Implemented
SU0105 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $258 $0 Implemented
SU0105 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $264 $90 Implemented
SU0105 # 06 Y:2001 06 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $34,064 $380,000 Not Implemented
AM0403 # 01 Y:2001 01 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $36,000 $0 Not Implemented
AM0403 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN WATER LINES AND VALVES $30,400 $1,770 Implemented
AM0403 # 03 Y:2001 03 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,290 $0 Not Implemented