IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,273

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1089 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $472 $550 Not Implemented
UD1089 # 06 Y:2024 06 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,228 $27,650 Not Implemented
UU0254 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,358 $5,447 Not Implemented
UU0254 # 02 Y:2024 02 2024 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $9,712 $81,738 Implemented
UU0254 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $509,495 $6,000,000 Implemented
UU0254 # 04 Y:2024 04 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,472 $2,250 Implemented
UU0254 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $264 $504 Implemented
UU0254 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,182 $5,868 Implemented
AS0583 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $87,396 $642,159 Not Implemented
AS0583 # 02 Y:2024 02 2024 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $43,888 $15,124 Not Implemented
AS0583 # 03 Y:2024 03 2024 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,022 $1,805 Not Implemented
AS0583 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,282 $4,696 Not Implemented
AS0583 # 05 Y:2024 05 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $137 $172 Not Implemented
AS0583 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $122 $476 Not Implemented
AS0583 # 07 Y:2024 07 2024 INSTALL SPECTRAL REFLECTORS / DELAMP $94 $52 Not Implemented
MI0449 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,976 $61,998 n/a
MI0449 # 02 Y:2024 02 2024 REPLACE TREATED WATER WITH WELL / SURFACE WATER $15,070 $13,480 n/a
MI0449 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,015 $1,980 n/a
MI0449 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,646 $700 n/a
MI0449 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,413 $3,096 n/a
MI0449 # 06 Y:2024 06 2024 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,254 $320 n/a
MI0449 # 07 Y:2024 07 2024 METER WASTE WATER $1,195 $900 n/a
MZ0364 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $5,079 $9,499 Not Implemented
MZ0364 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,335 $2,050 Implemented
MZ0364 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $42,019 $292,428 Not Implemented