Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,973
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0542 # 04 Y:2023 | 04 | 2023 | ELIMINATE/REDUCE AN OPERATION | $331 | $50 | Not Implemented |
AS0543 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,420 | $76,246 | Not Implemented |
AS0543 # 02 Y:2023 | 02 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $1,804 | $8,019 | Implemented |
AS0543 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,306 | $2,116 | Implemented |
AS0543 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $493 | $25 | Implemented |
AS0543 # 05 Y:2023 | 05 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $150 | $92 | Implemented |
AS0543 # 06 Y:2023 | 06 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $81 | $222 | Not Implemented |
DL0218 # 01 Y:2023 | 01 | 2023 | REDUCE VENTILATION AIR | $11,809 | $0 | Implemented |
DL0218 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $90,882 | $0 | Implemented |
DL0218 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,402 | $750 | Implemented |
DL0218 # 04 Y:2023 | 04 | 2023 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $10,992 | $10,000 | Not Implemented |
DL0218 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,159 | $10,000 | Implemented |
DL0218 # 06 Y:2023 | 06 | 2023 | INSTALL SET-BACK TIMERS | $473 | $1,000 | Not Implemented |
IC0275 # 01 Y:2023 | 01 | 2023 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,479 | $985 | Not Implemented |
IC0275 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,480 | $823 | Not Implemented |
IC0275 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,724 | $433 | Not Implemented |
IC0275 # 04 Y:2023 | 04 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $137 | $337 | Not Implemented |
IC0275 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $121,502 | $1,271,713 | Not Implemented |
IC0275 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $5,165 | $8,778 | Not Implemented |
MZ0340 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,529 | $720 | Implemented |
MZ0340 # 02 Y:2023 | 02 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,688 | $320 | Implemented |
MZ0340 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $27,810 | $3,202 | Not Implemented |
MZ0340 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $618 | $260 | Implemented |
MZ0340 # 05 Y:2023 | 05 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,940 | $4,520 | Not Implemented |
MZ0340 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,084 | $18,000 | Not Implemented |