IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0565 # 09 Y:1999 09 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $6,660 $13,660 Not Implemented
UD0565 # 10 Y:1999 10 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,846 $2,000 Not Implemented
UF0220 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,694 $4,040 Not Implemented
UF0220 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,337 $24,229 Implemented
UF0220 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,038 $2,200 Implemented
UF0220 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,096 $0 Implemented
UF0220 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,510 $400 Not Implemented
UF0220 # 06 Y:1999 06 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,275 $0 Implemented
UF0220 # 07 Y:1999 07 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,948 $15,000 Not Implemented
UF0220 # 08 Y:1999 08 1999 APPLY FOR INVESTMENT INCENTIVES $13,923 $50 Implemented
NC0162 # 01 Y:1999 01 1999 IMPROVE COMBUSTION CONTROL CAPABILITY $9,405 $15,000 Not Implemented
NC0162 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $5,501 $20,000 Not Implemented
NC0162 # 03 Y:1999 03 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,911 $10,500 Not Implemented
NC0162 # 04 Y:1999 04 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $7,571 $9,450 Not Implemented
NC0162 # 05 Y:1999 05 1999 METER WASTE WATER $2,279 $1,500 Not Implemented
NC0162 # 06 Y:1999 06 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,019 $1,050 Not Implemented
NC0162 # 07 Y:1999 07 1999 IMPROVE HANDLING PRACTICES $1,609 $1,500 Not Implemented
NC0162 # 08 Y:1999 08 1999 MOVE PRODUCT USING MECHANICAL MEANS $1,509 $5,200 Not Implemented
TN0657 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $13,800 Implemented
TN0657 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $320 $805 Implemented
TN0657 # 03 Y:1999 03 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $64,750 $890 Implemented
TN0657 # 04 Y:1999 04 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,000 $0 Implemented
TN0657 # 05 Y:1999 05 1999 ADD ADDITIONAL PRODUCTION SHIFT $110,000 $61,600 Implemented
AM0344 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $481,000 $1,207,000 Not Implemented
AM0344 # 02 Y:1999 02 1999 RECOVER AND REUSE WASTE MATERIAL $93,150 $110,000 Not Implemented